Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />46  <br />01C032018D  <br />  <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  <br />THIS CONTRACT  <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  <br />20. EXAMPLE PROJECT  <br />KEY NUMBER  <br />8  <br />21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  <br />Captiva and Sanibel Islands Beach Nourishment Projects  <br />Lee County, Florida  <br />PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  <br />1988‐Ongoing  1988/89, 1996, 2006,  <br />2008, 2013  <br />23. PROJECT OWNER’S INFORMATION  <br />a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  <br />Captiva Erosion Prevention District (CEPD)  Kathleen Rooker,   <br />Administrator ‐ CEPD  <br />(239) 472‐2472  <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  <br />APTIM has provided our comprehensive services to CEPD since 1988, including: coastal zone planning, permitting,  <br />engineering design, studies and design, coastal modeling, geotechnical, storm response efforts, construction assistance,  <br />biological and physical monitoring, funding applications, geographical information system (GIS) and CAD services, survey  <br />and mapping. Our history with the District is an example of our dedication to providing a wealth of technical and program  <br />management services that benefit our clients.  <br />APTIM designed, permitted, and supervised the construction of the beach renourishment projects for Captiva and  <br />Sanibel Islands. APTIM conducted the initial project feasibility study. APTIM also assisted with General Design  <br />Memorandum (GDM), which qualified the project for Federal reimbursement, amended and updated the project GDM  <br />for continued Federal funding, and provided benefit calculations for the Captiva Erosion Prevention District’s (CEPD)  <br />apportionments. APTIM developed the initial inlet management study in 1995 and is currently assisting with the inlet  <br />management study update. APTIM has assisted the District in securing FEMA funding assistance for multiple storm repair  <br />projects. In addition to beach nourishment, APTIM designed, permitted and supervised construction of the rehabilitation  <br />of the Redfish Pass terminal groin to improve sand retention on the island, which was partially funded by FEMA.   <br />The CEPD constructed the 2013 project locally, placing 740,000 cy of fill on Captiva Island and 75,000 cy of fill on Sanibel  <br />Island to replace storm damages from Tropical Storm Debby, and refilled the template to its full capacity. APTIM assisted  <br />CEPD with development of an expanded borrow area, construction plans, and specifications for the 2013 Captiva and  <br />Sanibel Islands Project. APTIM performed on site construction observations for the District and represented CEPD during  <br />the construction process. APTIM also developed a dune restoration and vegetation plan in conjunction with the  <br />renourishment project. APTIM is currently assisting the District with the post‐Irma assessment to seek FEMA  <br />reimbursement to repair storm damages to the project area.  <br />In 2014/15, APTIM prepared and submitted a 15‐Year multi‐use expedited permit application for repeat projects to the  <br />FDEP and USACE. This permit application allows for flexible management and response to major storms, hot spots, or  <br />routine maintenance. These permits allow flexibility to address a range of project needs. <br />     <br />25. FIRMS INVOLVED IN THIS PROJECT  <br />a.  <br />(1) Firm Name (2) Firm Location (City and State)  Role  <br />APTIM  Boca Raton, FL  Primary consultant  <br />   <br />Post construction photo of the completed 2013  <br />Renourishment, Captiva Island Beach  <br />Construction photo during the 2013 Captiva  <br />Island Beach