Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />49  <br />01C032018D  <br />  <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  <br />THIS CONTRACT  <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  <br />20. EXAMPLE PROJECT  <br />KEY NUMBER  <br />10  <br />21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  <br />Summary Planning Document for the Pinellas County Coastal Management  <br />Program, Pinellas County, Florida  <br />PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  <br />2011‐2013  N/A  <br />23. PROJECT OWNER’S INFORMATION  <br />a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  <br />Pinellas County  Andrew Squires,   <br />Coastal Management  <br />(727) 464‐4633  <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  <br />APTIM has recently assisted Pinellas County with the development of a comprehensive Summary Planning Document for  <br />the Pinellas County Coastal Management Program (CMP). This document defines aspects of the CMP, producing a  <br />comprehensive, “Go To” document that maintains all relevant CMP information in one location. This document is  <br />intended to be a “living” document, meaning it will be updated on a regular basis to reflect changes to the CMP. Specific  <br />components of the Summary Planning Document are described below:  <br />Section 1 presents a detailed description of the CMP from both a historical and current operations standpoint. This  <br />includes a description of the CMP history, current funding mechanisms, operations, recent significant storm events, and  <br />stakeholders and partners.  <br />Section 2 describes in detail all of the historical and current Federal project authorizations within the CMP. It covers the  <br />authorization legislation and documents, past and current federal projects, and any other aspects related to federally  <br />authorized coastal project within Pinellas County.  <br />Section 3 contains detailed descriptions of the CMP elements, including Anclote Key, Three Rooker Bar, Honeymoon  <br />Island, Caladesi Island, Clearwater Beach Island, Sand Key, Treasure Island, Long Key, Shell Key, Bunces Key, Mullet Key,  <br />Hurricane Pass, Clearwater Pass, John’s Pass, Blind Pass, North Channel (Pass‐A‐Grille Pass), South Channel (Pass‐A‐Grille  <br />Pass), Bunces Pass, offshore sediment borrow areas and artificial reefs.  <br />Section 4 contains a CMP needs analysis and schedule for future activities for each of the CMP program elements  <br />described in Section 3. This includes funding needs for the next six years (FY2012‐2017) and long‐term planning  <br />milestones through FY 2021.  <br />Section 5 describes the coastal management programs of three other coastal communities to provide information to the  <br />Pinellas County CMP from a comparative operational standpoint. The other programs described include Manatee  <br />County, Bay County, and Collier County.  <br />Section 6 outlines three possible CMP management strategies for the County with future planning recommendations.  <br />Section 7 contains final recommendations for the CMP moving forward. APTIM recommended that Pinellas County  <br />pursue a hybrid management strategy incorporating coordination and cooperation with Federal and State agencies with  <br />the flexibility to transition to a more financially self‐reliant program aided by consultants and in house staff.  <br />  <br />25. FIRMS INVOLVED IN THIS PROJECT T  <br />a.  <br />(1) Firm Name (2) Firm Location (City and State)  Role  <br />APTIM  Boca Raton, FL  Primary consultant  <br />