Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />48  <br />01C032018D  <br />  <br />with agencies, designed and calculated volumes of the dune fill templates, and produced a set of construction plan drawings  <br />on an expedited schedule.  <br />The truck haul project was constructed over three days in February of 2013. Approximately 2,500 cy of sand were hauled from  <br />E.R. Jahna’s Ortona sand mine and delivered to the northernmost public access at Delray Beach. Eastman Aggregates, Inc.  <br />placed the sand on the dry beach and graded it into sloping dunes along 970 linear feet of beach between R‐176 and R‐177.   <br />Delray Beach before and after construction (2013).  <br />During construction, APTIM engineers provided continuous construction oversight. The on‐site observer constantly monitored  <br />sediment quality and verified that fill placement met the design template. APTIM collected weight tickets and tracked  <br />delivered quantities for payment. During demobilization, APTIM engineers were able to ensure that the contractor returned  <br />the access and staging area to its original condition.  <br />25. FIRMS INVOLVED IN THIS PROJECT  <br />a.  <br />(1) Firm Name (2) Firm Location (City and State)  Role  <br />APTIM  Boca Raton, FL  Primary consultant  <br />