Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />40  <br />01C032018D  <br />  <br />APTIM worked to "piggy‐back" the Coquina Beach project  <br />onto the Federal project, saving Manatee County millions  <br />of dollars in mobilization/demobilization costs to nourish  <br />Coquina Beach. <br />APTIM provided geotechnical services to identify the  <br />sand source, the engineering services, State and FEMA  <br />funding acquisition assistance, permitting services,  <br />extensive environmental services, technical consultation  <br />and construction oversight services to help restore this  <br />portion of the island’s receding coastline.  <br />APTIM also developed and acquired permits for a seven‐ <br />mile‐long underwater pipeline corridor which allowed  <br />the dredging contractor to use the same equipment to  <br />deliver sand to both ends of the island. The use of an  <br />underwater pipeline to place sand in Coquina Beach avoided pipeline placement on the beach over  <br />almost the entire length of Anna Maria Island.  <br />APTIM also designed and constructed an approximate 5‐acre mitigative artificial reef approximately 1,100  <br />feet off the coast of Coquina Beach. APTIM staff worked aggressively on the County's behalf to limit the  <br />amount of required artificial reef as replacement for burial of nearshore hardbottom by the beach  <br />nourishment project, again saving Manatee County construction funds.  <br />Other notable efforts for the county:  <br />Federal Coordination and Funding in the City of Anna Maria Island  <br />APTIM assisted Manatee County with proceeding under the authority of Section 206 as the non‐federal  <br />sponsor of construct the federally authorized Central Beach nourishment project. Section 206 allowed  <br />Manatee County to engineer and construct the project, control the design and schedule and reduce  <br />engineering and construction costs.  APTIM adapted the construction project to include a 0.6‐mile coastal  <br />segment in the City of Anna Maria, which is not part of the Federal project.   <br />Emergency Response  <br />We have assisted Manatee County in securing funds and construction assistance for multiple storm repair  <br />projects: 2005 and 2011 projects in response to hurricane activity in 2004 (H. Charlie/Ivan), 2014 project  <br />in response to T.S. Debby, and currently working with the County to obtain FEMA funding associated with  <br />the storm damages from Hurricane Hermine and Hurricane Irma.  <br />Coastal Structure Removal & Replacement  <br />APTIM assisted the County with the Cortez Groins Removal and Replacement project, which included the  <br />demolition of three dilapidated pier‐type structures and replacement with new permeable adjustable  <br />groins in order maintain the stabilization of the shoreline that fronts the island’s evacuation route. The  <br />project was completed in 2016.  <br />   <br />  <br />Coquina Beach (2015).