My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APTIM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
APTIM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:44:15 AM
Creation date
3/23/2018 10:35:10 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach, Florida <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01 <br /> <br /> <br />Aptim Environmental & Infrastructure, Inc. <br />41 <br />01C032018D <br /> <br />Coastal and Waterway Program <br />CITY OF DEERFIELD BEACH, FLORIDA <br />Project Description <br />APTIM has provided various coastal and marine engineering <br />services for the City of Deerfield Beach since 2005 and is currently <br />assisting the City with the development and implementation of <br />their coastal and waterway program. The City’s waterfront <br />presents many unique challenges, which require attention during <br />design and permitting to avoid impacts to the environment while <br />maintaining project intent and benefit. The following provides <br />summaries of current and previous projects we are implementing <br />or have completed for the City. <br />Storm Berm Nourishment Project <br />Since 2016, our team of coastal engineers has been involved with <br />the preliminary design and permitting of a storm berm <br />nourishment project for the City. The project included topographic <br />beach surveys along the entire City shoreline to support the <br />preliminary design, which included a varying design template to <br />restore the dune and beach berm. Sand samples were collected <br />and analyzed by our in‐house geologists. A Coastal Construction <br />Control Line permit was prepared and submitted to FDEP. The final <br />permit was recently issued and provides the City with a proactive <br />mechanism to nourish their shoreline before or after a storm. <br />Hurricane Irma Pier Repair <br />APTIM performed a structural engineering assessment of the <br />International Fishing Pier to evaluate damage sustained during <br />Hurricane Irma. The assessment included both above and <br />underwater data collection, which was used to provide <br />recommendations for repair design. We provided structural <br />engineering design for the repair of the structure. The project is <br />currently under construction and we are providing construction <br />administration services. <br />Artificial Reef Project <br />APTIM is currently engaged by the City to design and permit <br />the construction of a recreational artificial reef in the <br />nearshore of the City offshore of SE 2nd Street. The project is <br />based on the Artificial Reef Feasibility Study we completed in <br />2010. The project is partially funded with grants from Florida <br />Sea Grant. APTIM completed a materials assessment of the <br />existing boulder stockpile in Tivoli Park, completed a stability <br />analysis to optimize the design, and prepared permit <br />applications for Broward County, FDEP, and the U.S. Army <br />Corps of Engineers. The project is currently in permitting <br />with construction expected in late 2018. <br />Client <br />City of Deerfield Beach, Florida <br />Client Contact <br />Patrick J. Bardes, Coastal & <br />Waterway Coordinator <br />City of Deerfield Beach <br />401 SW 4th Street <br />Deerfield Beach, FL 33441 <br />P: (954) 480‐1426 <br />F: (954) 480‐4393 <br />pbardes@deerfield‐beach.com <br />Project Date <br />Start: 2005 End: Ongoing <br />APTIM Staff <br />Tom Pierro – director and senior <br />project manager <br />Jordon Cheifet – project manager <br />and engineer of record <br />Stacy Buck – lead marine biologist, <br />permitting <br />Kathryn Brown – dive team lead <br />Lauren Floyd – senior marine <br />biologist <br />Michael Lowiec – surveying <br />Heather Vollmer – GIS mapping <br />Gary Krystyniak – CAD drafting <br /> <br />APTIM performed a topside assessment of <br />Hurricane damage.
The URL can be used to link to this page
Your browser does not support the video tag.