My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Superior Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-03) Right-of-Ways and Facilities Landscape Maintenance Services
>
Responses
>
Superior Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 4:20:24 PM
Creation date
4/25/2018 2:55:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Right-of-Ways and Facilities Landscape Maintenance Services
Bid No. (xx-xx-xx)
18-03-03
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 or 5,,, h <br />I. MATERIALS <br />147 <br />596 <br />I1 <br />Coconut Palm OTC Injection <br />Application <br />$ 12.00 <br />$7,152.00 <br />148 <br />I2 <br />Date Palm OTC Injection <br />395 <br />Application <br />$ 30.00 <br />$11,850.00 <br />149 <br />I3 <br />Topsoil (70/30 Mix) <br />200 <br />$ 55.00 <br />$11,000.00 <br />Delivered and Installed <br />Cu. Yd. <br />150 <br />I4 <br />Premium Gold Mulch <br />1,500 <br />$ 45.00 <br />$67,500.00 <br />Delivered and Installed <br />Cu. Yd. <br />151 <br />I5 <br />Premium Gold Mulch <br />100 <br />Bags <br />$ 3.50 <br />$ 350.00 <br />Delivered and Installed <br />2 cu. ft. <br />152 <br />I6 <br />#70 Trap Sand <br />Delivered and Installed <br />700 <br />Cu. Yd. <br />$ 40.00 <br />$ 28,000.00 <br />153 <br />I7 <br />Atlas 3000 (or equal) Mix <br />100 <br />$ 40.00 <br />$ 4,000.00 <br />Delivered and Installed <br />Cu. Yd. <br />154 <br />I8 <br />Solid St. Augustine 'Floratam' Sod <br />2500 <br />$ 76 <br />$1,900.00 <br />Delivered and Installed <br />Sq. Ft. <br />155 <br />19 <br />Solid St. Augustine 'Floratam' Sod <br />60 pallets <br />(500 SF <br />$ 380.00 <br />$ 22,800.00 <br />Delivered and Installed <br />Each <br />156 <br />I10 <br />Solid Bermuda 'Tifway 419' Turf <br />5 pallets <br />(400 SF <br />$ 500.00 <br />$2,500.00 <br />Delivered and Installed <br />Each <br />157 <br />I11 <br />Solid Paspalum notatum Argentine' Bahia Sod <br />5 pallets <br />(400 SF <br />$ 650.00 <br />$3,250.00 <br />Delivered and Installed <br />Each <br />158 <br />I12 <br />Palm Beach Cap Rock <br />4 Sq. Ft. <br />$ 29.00 <br />$116.00 <br />Subtotal Section "I" Lines No. 147 —158: <br />$160,418.00 <br />J. LABOR <br />159 <br />100 Hours <br />11 <br />One Landscape Superintendent <br />(8am — <br />29.00 <br />2,900.00 <br />5pm, M -F) <br />$ <br />$ <br />City of Sunny Isles Beach I ITB 18-03-03 Right -of -Ways and Facilities Landscape Maintenance Services • <br />
The URL can be used to link to this page
Your browser does not support the video tag.