My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Superior Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-03) Right-of-Ways and Facilities Landscape Maintenance Services
>
Responses
>
Superior Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 4:20:24 PM
Creation date
4/25/2018 2:55:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Right-of-Ways and Facilities Landscape Maintenance Services
Bid No. (xx-xx-xx)
18-03-03
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" 'DF S-mA h� - <br />160 <br />100 Hours <br />J2 <br />One Landscape Superintendent <br />(All other <br />39.00 <br />$ 3,900.00 <br />times) <br />$ <br />161 <br />100 Hours <br />J3 <br />One Landscape Laborer <br />(8am — <br />5pm, M -F) <br />$ 24.00 <br />$ 2,400.00 <br />162 <br />100 Hours <br />34 <br />One Landscape Laborer <br />(All other <br />30.00 <br />$3,000.00 <br />times) <br />$ <br />163 <br />75 Hours <br />15 <br />One Irrigation Specialist <br />(8am — <br />5pm, M -F) <br />39.00 <br />$ <br />$ 2,925.00 <br />164 <br />50 Hours <br />J6 <br />One Irrigation Specialist <br />(All other <br />times) <br />$ 52.00 <br />$2,600.00 <br />165 <br />75 Hours <br />J7 <br />One Irrigation Laborer <br />(8am — <br />5pm, M -F) <br />$ 23.00 <br />$1,725.00 <br />166 <br />50 Hours <br />18 <br />One Irrigation Laborer <br />(All other <br />times) <br />$ 30.00 <br />$ 1,500.00 <br />Subtotal Section "J" Lines No. 159 —166: <br />$ 20,950.00 <br />K. EQUIPMENT <br />K1One <br />Front End Loader with Backhoe, <br />5 Hours <br />r16 <br />including an Operator (Hourly Rate) <br />55.00 <br />275.00 <br />K2 <br />One Front End Loader with Backhoe, <br />5 Days <br />including an Operator (Daily Rate) <br />450.00 <br />2,250.00 <br />169 <br />K3 <br />One 15,000 GVW (or larger) Dump Truck with <br />5 Hours <br />an Operator (Hourly Rate) <br />45.00 <br />225.00 <br />170 <br />K4 <br />One 15,000 GVW (or larger) Dump Truck with <br />5 Days <br />an Operator (Daily Rate) <br />400.00 <br />2,000.00 <br />171 <br />One Trailer Mounted Water Tank (500 gallon <br />K5 <br />minimum) with Pump and Hose Reel <br />5 Days <br />(Daily Rate) <br />220.00 <br />1,100.00 <br />City of Sunny Isles Beach I ITB 18-03-03 Right -of -Ways and Facilities Landscape Maintenance Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.