My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Superior Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-02) Parks and Recreational Facilities Landscape Maintenance Services
>
Responses
>
Superior Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 11:11:00 AM
Creation date
4/25/2018 4:33:49 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parks and Recreational Facilities Landscape Maintenance Serv
Bid No. (xx-xx-xx)
18-03-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXAMPLE: On a 25 mph street, warning sign should be at least 25 X 5 = 125 ft. before the <br />activity area. On a 45 mph street, the sign might be 45 X 8 = 360 ft. "upstream." <br />When your work obstructs any part of the roadway, advance -warning signs are required in both <br />traffic directions on a two-way road. Multiple signs may be needed on high-speed roads or where <br />visibility is obstructed by something like a bend or hump in the road. <br />Transition area — the section of road where traffic is redirected out of its normal path. The <br />transition area makes use of a "taper," created with cones. A good rule of thumb is to space cones <br />the same number of feet apart as the speed limit. For daytime work and low speed (40 mph and <br />under) roads, 18 -inch cones are acceptable. For nighttime and/or higher speed roads, 28 -inch <br />cones are required. <br />Taper length is important. Table 1 below gives rule -of -thumb taper lengths, based on the width of <br />the work zone (W), in feet. <br />Table 1: Traffic Taper Length, based on Width of Offset (W) <br />Type of taper Seed limit (mph) <br />15 25 35 <br />165 <br />merging 4W loW 120W 27W <br />45W <br />55W <br />65W <br />Shifting 2W 5W im 13W <br />123W <br />28W <br />33W <br />shoulder 1W 3W 17W 9W <br />115W <br />18W <br />21W <br />one -lane, two-way 100 ft. maximum, flag ers required <br />downstream 100 ft. per lane <br />Activity area — this is the section where the work actually takes place. It should include a buffer <br />space, sort of an extension of the work area in the direction of oncoming traffic (longitudinally) <br />or extending past the side of the work vehicle (laterally), but free <br />of equipment, vehicles and material. <br />Termination area — is used to return vehicles to their normal <br />path downstream of the work. <br />In rural areas, there are generally higher speed limits, less <br />turning traffic, lower volumes of traffic and fewer pedestrians. <br />Urban areas are usually just the opposite. Your crew must <br />evaluate the location, decide which controls are to be used, and <br />see that a plan is followed. Your goals are to create a safe and <br />efficient work site for your crew and passersby, to hinder traffic <br />as little as possible and to guide vehicles and pedestrians in a <br />clear and positive manner. <br />Action steps for work site set-up: <br />❑ keep equipment and material neat and orderly within the <br />protected area <br />Orange Flag <br />(optional) <br />4 <br />0.3m(Ift) <br />MIN. <br />Typical warning sign <br />❑ use the truck's four-way flashers and beacon light, u so <br />equipped, while you're setting up the signs and cones <br />❑ always chock trucks or detached chippers with at least two chocks <br />❑ be especially careful whenever children are in the vicinity <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.