sebconCa".rig any pardon or specialized grounds
<br />malntenancc -wk.
<br />1.53 L.UI'ISULIAIYi SCKY1l:tS:
<br />The O,y, at Its sole discretion may hire a Consultant who
<br />may serve the r3,y'3 tpre3enmtlee Fur the p%ect. Where
<br />o Co.zeltant ho; bcc.. identified, the Con3eiwnT and the
<br />Project Mo.zigep -ill both hose ..etherity to a[t on behalf
<br />of the Ciry to the extent pro-ided i;; the Contract
<br />Documents and as outlined in Article 1.54, Authorlry of the
<br />Project Manager, where such authority has been delegated
<br />In wriMag by Ci,y 14ar. ager.
<br />The City Manager hereby authorizes the Project
<br />Manageris) to determine, all questions of any nature
<br />whzit!R1c:cr arising oaz of, ander or in wnne ion nim, or
<br />I;-. ,.ny -ay relotieg to or on aeeoant of the Work, .meal
<br />q-zestinm! o: to the Interpretatlem of the Worst to be
<br />performed under the Contract Documents. The Project 1.55
<br />Manager may delegate some of the authority contained In
<br />the Article to the Consultant.
<br />The Contractor IN bound by ..II determin,.tiorrs or orders of
<br />the Proj_ct Ma;;egep(p) and rn__t ppemptly rezpond to
<br />requests of the Project Manage;Zsj, Incled;ng the
<br />withdrawal or modification of any previous order, and
<br />regarole33 or weemer the Contractor agrees with the
<br />Project Mzinzigcr's &z .... inzizo., „r regti=. ,.acre
<br />regs�sts arc mFde orally, the Project Monoger(,) -ill fJtl
<br />_p In-iting, as so=;: thepeafte; I: ppactieeble.
<br />The Project Managerrysr and Consultant have authority to
<br />as un behalr or mc tmy to tee extent provided by the
<br />Contract, anlaw othcrwix m,.d;ficd ir...r ilting by the CIZy.
<br />All In--tructlen, to the Contractor -ill be issued through the
<br />City Manage. o;: desi4;;ee up the Ppelect M.n.ger.
<br />The Project Managerysj will not be responsible far 1.56
<br />consaacaon mans, memoos, Techniques, sequences or
<br />pracedam5, or for _fety prceeodons zind programs in
<br />eennectien with the Werk, o.d -111 net be rt=pom3ibL for
<br />the Contractor's fallupe to cap" ont the Werk In vee-_rdanee
<br />with the Contract Documents.
<br />All inwrprzmdons and rcl...rmmenuations or the Project
<br />Moragc.(m) ..nd Con,cltant :ill be coruisten, with .he
<br />I"tent of the Contract Docunpents.
<br />Interpretation of the Contract terms and conditions will be
<br />issued by the City's Procurement Manager.
<br />Eng of ae+CLion
<br />`r 1, or V." Pr -
<br />The Project Manager(sr and Consultant will have authority
<br />m refect :.,rR mai does not conform to the Contract
<br />Doeomcnts. Whe.,v-,,.r, In their opinion, It is w,.3iderco
<br />- wry or advl-blc to en,ak the proper cernplction of
<br />Work the Project Mana;ep op Con_oita.,t hoz oathurity to
<br />require special Inspections or testing of the Work, whethep
<br />or not such work is fabricated, installed or completed.
<br />The Project Manger's oathari,y Ta zits under th,3
<br />p;mgpoph, up ziny deeiNion m..de In good faith either to
<br />exercise op not to —ruse =soh authority, gi=n rise to any
<br />duty or responsibility of the Project Manager to the
<br />Contractor, any subcontractor, supplier or any of the r
<br />ogcne, employees, or any other person performing any of
<br />the Work.
<br />The Project Manager is net %:penelble fop the 9ct5 up
<br />omissions of the Contractor, any subcontractor, or any of
<br />their agents or employees, or any other persons
<br />performing any of the WarR.
<br />IPREPAREDNESS:
<br />During such time as are designated by the United states
<br />e-ther Bureau or Miami -Dade Counyas being a severe
<br />gather tm.n4 including a 1larncane watch or warning, the
<br />Contractor, ..t no rest to the City, most take ..II pr.eaetiona
<br />nee Mpy to .-esti ziny Work In rtzpon,e to 011 thr—toned
<br />storm events, regardless of -hethep the Contractor ha_
<br />been given notice of same, In accordance with the Miami -
<br />Dade Courcy code.
<br />Compllanee with ...y 3peeifc ere wcathe. evenr or acre
<br />pies -flea_ -ill rr.t eenatitute zidd'tkja..1 meek. In the
<br />event of a severe weather event, the City must be a priopity
<br />client to the Contractor. At a minimum, Contractor must
<br />rt3pona to the Chy's request In accordance with Its
<br />Emergency Response Plon ander .,.,,dc
<br />omi. i3 or rte essence with regard to completion of the
<br />Werk to be perfo.-cd ender the Concoct. Contr.�r ;ill
<br />ppuerptly perfem Its dotle= ender the Contract and .ill
<br />gi-e the Wopk as pouch priepity a: i= r,cae pp to ee=- the
<br />Work to be completed on a timely basis.
<br />Delays and ew,cn3ioi.3 or ame may be allowed only In
<br />oeeerd..nce .ith the pro:l3ior.3 of the Conli = The umc
<br />ollo-,zed fop eempletioe of the -opk 7.111 be ,tated In the Bid.
<br />City of Sunny I3les 6eacR I ITB 18-03-02 Parks and Recreational Facilities Landscape MainLenance Services
<br />Lukes' Lutt> ibUnyizigg 1juZ. A4A
<br />
|