Laserfiche WebLink
`r r are sum <br />connection wltR tRe worK, and taRe all necessam y precautions to prevent accidents, injuries, or <br />damage to persons or progeny on or near the Work. <br />The Contractor 13 3olcly responsible for, and must replace and make good all loss, injury, or damage <br />to any propeyIncluding, but not limited to, land„ping, irrigation, walks, drives, structures, or <br />utilities resulting from performance of the Work. <br />2.31 CONTRACTOR'S RESPONSIBILITY FOR UTILITY PROPERTIES AND SERVICE <br />Where the Contractor's operations could cause damage or inconvenience to telephone, fiber optic, <br />television, electriml power, oil, gas, water, sewer, or Irrigation systems, the Contractor must make <br />all arrangements necessary for the protection of these uulities and services or any other known <br />utilities. <br />Notify all UdIlty companies that are affeRed by the consuuRion operation at least Foray-eigRt t2i31 <br />hours in advance. tinder no clrumswnce expose any utility without First o0talning permission From <br />the appropriate agency. Once permission Ras Veen grantet], locate, expose_ an0 provlae temporary <br />support for all existing un0ergroun0 uulities an0 utility poles wRere necessary. <br />i ne C.ontraRor ana its Suucontractors will Be solely anC alrec ly responsiole to me owner an0 <br />operators or such properties for any Carnage. Injury. expense, loss, inconvenience Delay, suits, <br />anions_ or claims or any cnaraUer VrougRt oecause or an, Injuries or damage which may result <br />From tRe construction operations unser tRe ContraR uocurnernts. <br />iveltner tRe Ciry nor Its officers or agents will be responsible to thz Cvntrrctor for damages as a <br />result or the Contractor's failure to protect propeyanzountered In the Work. <br />In the event of interruption to d%mestic water, sewer, storm drain, or other utility ,lzrvices as a <br />result of ac id%ntal breakage due to construction operation,, Contractor must promptly notiry the <br />owner, any required regulatory authority, and the Project Manager(s). Contractor shall also <br />cooperate with said authority In restoration of service as promptly as po55ibla and bear all costs of <br />repair and any required interim measures to ensure safety. In no event will Interruption of any <br />utility service be allowed unless granted by the owner of the utility. <br />In the event wat<r service lines that Interfere with trenching are encountered, the ContraLTor may, <br />by obtaining prior approval of the water utility, cut the service, dig through, and restore the service <br />with similar and equal materials at the ContraCLor's expense and as approved by the Project <br />Manager(s). <br />The Contractor shall replace with material approved by the Project Managerts) or Consultant_ at <br />Contra�tor'S expense, any and all other laterals existing utilities or struRures removes or oamagen <br />during consuuELlon-unless otherwise provide0 for In me Contract Documents ant] as approves By <br />the Project Manager-ks) or Consultanu <br />i ne Contractor sRall replace wit” material approves By tRe Project Manager or Consultant, at <br />Contractor's expense, any existing udildes Camagetl During tRe vvorR. <br />City of sunny Isles 6eacR I I 10 Is -03-0i Parits ans Recreational Facilities [antiscape Maintenance Screices <br />Lukes' Lan&z:.p:ug,1nc. <br />