Laserfiche WebLink
"Ov of sstm I," - <br />2.32 ACCESS TO WATER AND UTILITIES <br />The Contractor Is responsible fur providing all water and power required for the performance of <br />the Work, including the use of a generator, fuel, etc. The use of a generator may be subjeu to <br />the prior approval of the Project Manager(s) and may be withheld when the vvork Is In a primarily <br />residential neighborhood. Electrical power required during ConbuoLion must be Installe0 ey a <br />qualified electrical contractor approved by the ProjeR Manager(s). <br />Conuc,Uor will be responsible to provide all oi its employee's sumdent access to Oriniung water at <br />the <br />Fie City may at Its sole Discretion provitle access Eo C.IEy utilities or water srlould such be available <br />at Erle vvorR site. however- me ContraMor Is responsil5le to ascerMIn Erle location and accessibility <br />or any utilities ane potaRle water sources necessary Eo perrorm the Work. The abillty of the City <br />to mage uukles avallatile Eo Ene ConErar-Tor musE not form an, basis for a change ardor or claim <br />5y Erle ContraRor. <br />i.ss �.uyRDiNAIION Or i FIE VVUKK <br />Prior to the commencement of tha Wurk under the Contract, the Project Manager(s) will make <br />e.e,, effort, based on available In!"ormation, to notiry the Contractor of any ongoing or scheduled <br />projZC45) that will be ongoing or commence during the Work on a Project that may require <br />coordination. The Contractor will be solely responsible for coordinating the Work with any other <br />project(s) to minimize any potential adverse impact. Contractor will not be entitled to any days of <br />delay for failure to prNedy coordinate the Work. The Project Managers) may a,slst the ContraLTor <br />in coordinating the Work. However, any such assistance, or lack thereof will not form the basis for <br />any claim for delay or Incrca=d cost. <br />If any part of Contractor's Work depend, upon proper execution or results from the work of any <br />other persons, Contractor must inspect and promptly report to ProjeR Manager(s) any nevem in <br />such work that render it unsuitable for such execution and results. LontraCCor's -[allure to so inspeLT <br />and sport will constitute an acceptance of the other person's worn as nt anti proper for Erle <br />reception of ContraRor's Work, ex' -EPL as to defemwMlcM may Deveiop In otner conEraLTor's work <br />after the execution of contramr's vvork. C.onudLTor must conauLT Its operations ano Eaxe all <br />reasonable Steps to coordinate uie prosecution or tine vvoRt so as to creaEe no inEeRerence or <br />Impart on any other contratTor on tine site. Snoul0 sut'rl InteRerence or impaLT occur, Contractor <br />will be liable to Erle anetTetl contractor ror Erle cosE of suck intefference or Impact. <br />L'i'Lt�1i'Jl_i_r3;J:4L IA 149 X-1 4118-7 <br />City will provide Ene lani7s upon wRlcrl me vvo,R is to be performed, rights-of-way and easements <br />ror access trlerem ana suck oERer lanes as are designated b, Ciry for use of Contractor. <br />z. 5.-1 CEEAN-DP <br />Contractor must, at all times, keep the work site(s) free from accumulation of excess materials, <br />Cit, or _,)enr, IIIc.. Or --.M I I i 5 is-O_i-Ot PorRS and Recreational Facilities Landscape Maintenance Services <br />LuKEa` Liru03C;%tP; ig9 tui.. -A <br />