Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH SECTION 01000 - 2 <br />SUMMARY OF WORK <br /> <br /> Perform a well “yield test” to confirm that the original design production rate 600 gpm/ft <br />head has been achieved. Additional well development may be required until that rate has <br />been achieved. <br /> Insert concrete grout between the existing casing and the new 20” PVC casing using <br />“tremie” method. Replace steel grate/screen on top of the well casing and restore the site <br />(asphalt, concrete paving, concrete curbing or sodding if damaged during maintenance <br />activities). <br /> Perform condition assessment on three (3) outfall pipes (10”, 16” and 12” diameters) <br />identified on the Project Location Map and several others observed during recent site <br />visit to assure that they are plugged/abandoned per the original design plans. The intent <br />is that the North Bay Road street system is not impacted by high tides backing up and <br />causing street flooding. If the outfalls are not plugged, CONTRACTOR shall install inline <br />check valves that will allow one directional flow from upland street level to the Intercoastal <br />waterway only. <br /> Some of the existing gravity wells may be converted to “mini injection wells” in order to <br />attain better discharge capacity and provide a greater relief to the project area. OWNER <br />may direct CONTRACTOR to furnish design, permitting, materials, labor, and equipment <br />to convert selected drainage wells to injection wells. <br />In performing the scope of work, the CONTRACTOR shall furnish all labor, materials, <br />transportation, tools, supplies, equipment and necessary appurtenances to rehabilitate and <br />re-develop the wells and address the outfall piping to the satisfaction of the OWNER as <br />specified herein. <br />1.2 EQUIPMENT AND PERSONNEL <br />The CONTRACTOR shall furnish capable personnel and equipment required to handle the <br />materials and perform the tasks specified herein. The OWNER or its ENGINEER shall <br />reserve the right to inspect the equipment of the CONTRACTOR to assure qualification. The <br />awarded CONTRACTOR shall repair or replace any equipment not considered by the <br />OWNER or ENGINEER to be satisfactory. At the OWNER’s discretion, the CONTRACTOR <br />shall demonstrate the accuracy and precision of the CONTRACTOR’S methods of <br />measurement. <br />The CONTRACTOR shall provide and mobilize a clean water storage tank, for the <br />CONTRACTOR’S use onsite. The tank shall be acceptable to the OWNER and be used for <br />storage of water and sludge/debris to be removed and disposed of at an approved/licensed <br />facility. <br />1.3 SITE CONDITIONS <br />Each well site is located in an area with adequate access. The CONTRACTOR shall use the <br />designated access location for each well site. The CONTRACTOR is assumed to have