My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 01000 - 3 <br />SUMMARY OF WORK <br /> <br />viewed the well sites before submitting a bid. Specific work tasks requiring additional laydown <br />area for materials and/or equipment will be agreed upon by the OWNER and CONTRACTOR <br />prior to any notice to proceed. <br />The cost of all equipment, supplies, and materials necessary to disassemble the well grate <br />and connect temporary piping or equipment that will be used to accomplish the scope of work <br />shall be included in the line item bid price for that item. Other existing improvements at each <br />site shall be removed, as needed, with prior approval by the OWNER. During the period of <br />the contract, the CONTRACTOR will protect all well appurtenances removed by the <br />CONTRACTOR; protect all remaining improvements; and protect any equipment loaned to <br />the CONTRACTOR. <br />CONTRACTOR shall secure any well structure within his/her scope of work and prevent <br />unauthorized access at all times. When the CONTRACTOR is off site, the well structure shall <br />be properly protected, <br />The CONTRACTOR will advise the OWNER of any device or appurtenances known by the <br />CONTRACTOR to be broken or unstable upon discovery. The CONTRACTOR shall replace, <br />at the CONTRACTOR’S expense, items that are damaged, broken, or rendered unusable as <br />a result of actions by the CONTRACTOR. <br />1.4 DESCRIPTION OF EXISTING WELLS <br />The existing well construction details are provided in the Appendix of these specifications. <br />1.5 SPECIFIC WELL REHABILITATION WORK TASKS <br />Well rehabilitation may include the following work tasks or any combination thereof: <br />A. Mobilization/Demobilization: Included in this task is the transport of all necessary drilling <br />equipment, pumps, motors, surge tanks and other ancillary equipment on site, including <br />restroom facilities for CONTRACTOR’S use, preparation of the site for set-up of the rig <br />and all necessary equipment and set-up of all necessary drilling and/or rehabilitation <br />equipment to perform the well rehabilitation, including erosion prevention measures, <br />drainage Best Management Practices, and sedimentation collection measures. All <br />associated permitting requirements to transport and set-up the drilling equipment are also <br />included in this task. <br /> <br />B. Remove Grate/Screen on Well Casing Riser: The existing well grate/screen on the well <br />casing riser within the concrete well structure will be completely removed by the <br />CONTRACTOR. The existing casing shall remain in place and undamaged. <br /> <br />C. “Before” Downhole Video: CONTRACTOR to videotape the condition of the concrete well <br />structure and the open hole of the well casing to determine sludge /debris buildup.
The URL can be used to link to this page
Your browser does not support the video tag.