My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 01000 - 5 <br />SUMMARY OF WORK <br /> <br /> <br />J. Install New Well Grate/Screen: The CONTRACTOR will supply and install a stainless- <br />steel well grate replacement at each well location. This work shall include, but not be <br />limited to, stainless steel wire-wrapped screen, all labor, materials and equipment <br />necessary for proper the proper re-screen installation. Well grate/screen size to match <br />the existing damaged well screen. <br /> <br />K. Perform Outfall Condition Assessment: CONTRACTOR shall perform cleaning and <br />CCTV inspection of storm drain lines that are connected outfalls in order to confirm <br />whether they are plugged or open and operational. OWNER shall identify which outfalls <br />are to be assessed. Abandonment in place “as is” will not be acceptable. If any of the <br />outfalls are not properly plugged, the CONTRACTOR shall notify the OWNER. If directed <br />by OWNER, CONTRACTOR shall install an inline check valve to assure that there is no <br />street flooding due to backflow from the high tides in the Intracoastal Waterway. <br />CONTRACTOR shall also install aluminum manatee grate at each outfall. <br /> <br />L. Replace Grates/Screens and Restore Sites: CONTRACTOR to replace all <br />grates/screens on each of the wells as needed and restore the site, i.e., asphalt, concrete <br />sidewalk, curbing and/or sodding if damaged during the maintenance activities. <br /> <br />M. Design-Build Services for Conversion of Existing Drainage Wells to Injection Wells: Some <br />of the existing gravity wells may be converted to “mini injection wells” in order to attain <br />better discharge capacity and provide a greater relief to the project area. OWNER shall <br />determine which existing gravity wells are optimal candidates for conversion. OWNER <br />may direct CONTRACTOR to provide Design-Build services that may include but not <br />limited to engineering design, testing, permitting with all applicable agencies, materials, <br />labor, and equipment to convert selected drainage wells to injection wells. <br /> <br />1.6 DISPOSAL OF WASTES AND DEBRIS <br />The CONTRACTOR shall provide containment for all fluids and solids associated with the <br />pumping/jet vac work described in these specifications. The CONTRACTOR shall dispose of <br />all spent wastes off site by the end of business day in an environmentally responsible manner <br />and in accordance with all implementing regulatory agencies. Water that meets criteria for <br />discharge on site may be discharged on site. The CONTRACTOR shall minimize flooding to <br />adjacent properties and roadways. If necessary, temporary berms will be constructed and/or <br />piping shall be installed to divert all discharge water to an approved drainage structure. <br />CONTRACTOR shall be responsible for implementing Best Management Practices (BMPs) <br />for erosion and drainage protection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.