My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 01000 - 6 <br />SUMMARY OF WORK <br /> <br />1.7 SITE RESTORATION <br />Upon completion of the work, the CONTRACTOR shall replace existing grates/screens with <br />new grates/screens, landscaping, irrigation, damaged pavement and curbing, sod and all <br />other appurtenances to restore each site to the satisfaction of the OWNER. Each well shall <br />be left clean; free of oils, grease, or any other substances used during rehabilitation. The <br />CONTRACTOR shall remove from the site all removed deposits, existing well materials, <br />debris, unused materials and chemicals. The CONTRACTOR shall restore the site to its <br />original or better condition acceptable to OWNER including repair or replacement of <br />damaged components at no additional cost to the OWNER. Site restoration shall also include <br />any restoration work to the water discharge outfalls, drainage ditches and canals. <br />1.8 TIMEFRAME AND WORKING HOURS <br />The CONTRACTOR shall mobilize to the site and be actively performing the scope of work <br />required in these specifications within 10 calendar days upon authorization to proceed <br />(NOTICE TO PROCEED) by the OWNER. The CONTRACTOR shall be diligent in <br />completing the specified tasks during normal working hours to completion. The <br />CONTRACTOR is required to provide a minimum two (2) working days’ notice to the OWNER <br />and/or ENGINEER when work tasks require an on-site supervisor by the OWNER or <br />ENGINEER. All maintenance, rehabilitation and construction activities will be initiated during <br />the following hours: <br />a. Standard time: 7:00 a.m. to 6:30 p.m. Monday through Thursday, 7:00 a.m. to 5:00 <br />p.m. on Friday, and 9:00 a.m. to 5:00 p.m. on Saturday. <br />b. Daylight saving time: 7:00 a.m. to 7:00 p.m. Monday through Thursday, 7:00 a.m. to <br />5:00 p.m. on Friday, and 9:00 a.m. to 5:00 p.m. on Saturday <br />c. No construction activities shall take place on Sunday and on the following holidays: <br />New Year's Day, Fourth of July, Labor Day, Yom Kippur, Thanksgiving Day, and <br />Christmas Day. <br />1.9 REPORTING <br />On a daily basis, the CONTRACTOR shall complete the Daily Work Log Form and submit a <br />copy to the OWNER and the ENGINEER on a weekly basis. A copy of the form may be <br />requested by the OWNER or ENGINEER at any time. Include in the log the names of <br />personnel on site, hours on site, and a detailed description of type of work performed, any <br />problems, date and time for each entry. The log shall be kept current with a copy located at <br />the well site and be available for inspection by the ENGINEER. When performing <br />development work, an additional Daily Development Log shall be completed on a daily basis <br />and submitted to the OWNER and ENGINEER on a weekly basis in conjunction with the <br />Daily Work Log Form. Any pay application submitted with incomplete daily logs will be <br />automatically rejected. The CONTRACTOR shall notify the OWNER immediately if
The URL can be used to link to this page
Your browser does not support the video tag.