Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH SECTION 01025 - 4 <br />MEASUREMENT AND PAYMENT <br />  <br /> <br />F. ITEM NO. 6 – WELL DEVELOPMENT (INCLUDING AIRLIFT, JETTING WITH <br />SIMULTANEOUS AIRLIFT, AND PUMP DEVELOPMENT): Well Development (sludge <br />removal) shall be paid for at the Contract Unit Cost Price as listed on the BID FORM as <br />determined by the ENGINEER as development and as described in Section 03500. The <br />said Contract Unit Price shall include only hours of actual pumping as approved by the <br />ENGINEER and shall not be limited to the furnishing of all material, labor and equipment <br />necessary to complete development in accordance with the Contract Documents and <br />accepted by the Engineer. <br /> <br />G. ITEM NO. 7 – “AFTER” DOWNHOLE VIDEO AND LOG: The video log, taken subsequent <br />to completion of cleaning of the existing concrete well structures and the existing well <br />casings, shall be paid following each successful video log for wells at the Contract Lump <br />Sum Price listed on the Bid Form as specified in the Contract Documents and accepted <br />by the ENGINEER. Video logging shall include but not be limited to the furnishing of all <br />material, labor and equipment required, as specified in Section 03300. Only successful <br />video logs accepted by the ENGINEER will be paid for under this pay item. Video shall <br />be conducted by a professional video logger specializing in downhole well videos. <br /> <br />H. ITEM NO. 8 – SITE RESTORATION: The work specified under this pay item includes <br />restoring the site to its original condition, restoring site conditions to the satisfaction of <br />the ENGINEER and OWNER and as described in Section 01535. Restoration includes <br />replacement of sodding, asphalt pavement, concrete pavement and/or sidewalks, <br />concrete curbing. Payment shall be at the Contract Lump Sum Price, for all twenty (20) <br />well sites, as listed on the Bid Form and shall include all equipment, tools and labor <br />necessary to restore the site complete and accepted by the OWNER. <br /> <br />ALTERNATE 1 <br /> <br />I. ITEM NO. 9 – INSTALL NEW 20-INCH DIAMETER PVC LINER CASING: The <br />CONTRACTOR shall supply and install the specified amount of PVC Liner in accordance <br />with the actual casing depth determined by the “before” downhole video results. <br />Measurement and payment for this item shall be made at the Contract Unit Price for the <br />actual amount installed at each well location as listed on the Bid Form and as specified <br />in the Contract Documents and accepted by the ENGINEER. <br /> <br />J. ITEM NO. 10 – CONCRETE GROUT (TREMIE) 20-INCH LINER: The CONTRACTOR <br />shall supply and install appropriate amount of concrete grout using “tremie” method in <br />the annular space between the existing 24” casing and the new 20” PVC liner to restore