Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH SECTION 01025 - 5 <br />MEASUREMENT AND PAYMENT <br />  <br />the well casing integrity if required. Measurement and payment for this item shall be made <br />at the Contract Unit Price per linear foot of well casing at each well in need due to <br />compromised condition of the existing well casing. <br /> <br />K. ITEM NO. 11 – PERFORM “WELL YIELD” TEST: Upon completion of entire maintenance <br />and rehabilitation of the concrete well structure and the well casing, the CONTRACTOR <br />is to perform a “well yield” test to assure the production rate required in the contract <br />documents. The tests shall be paid for at the Contract Unit Cost Price as listed on the <br />BID FORM. The Unit Price shall include but not be limited to the furnishing of all material, <br />labor and equipment necessary to complete the test as specified including all work <br />necessary for the installation and removal of test pump and piping. <br /> <br />ALTERNATE 2 <br /> <br />L. ITEM NO. 12A,B– STORM DRAIN CLEANING AND CCTV INSPECTION: <br />CONTRACTOR to perform cleaning and CCTV inspection of the storm drain lines that <br />are identified by the OWNER. Measurement for cleaning and CCTV shall be measured <br />in linear feet of piping cleaned and video inspected for various diameters and types of <br />pipes as shown on the BID FORM. Payment for cleaning and CCTV will be for furnishing <br />all labor, materials and equipment for each linear foot of piping cleaned and video <br />inspected, including but not limited to, completely clean the pipe, mineral deposit removal <br />including removal of all mineral deposits greater than 10% of the piping diameter, or <br />mineral deposits that would hinder the application or installation of subsequent <br />rehabilitation or maintenance equipment, debris and grease removal including removal <br />of all grease and debris from the sewer and proper disposal, plugs for isolation of piping <br />and manholes, bypass piping and pumping, protection of downstream pipes, proper <br />handling of equipment and materials, hauling and disposal of all removed material, <br />furnishing, installing and set up of all equipment required for post cleaning CCTV of the <br />piping to confirm the condition, submit copies of the post cleaning inspection video in the <br />required NASSCO compliant database to document the condition prior to the proposed <br />rehabilitation work and all other labor, materials and equipment to complete the work to <br />the satisfaction of OWNER. <br /> <br />M. ITEM NO. 13A, B, C, D, E, F, G, H, I – INSTALL INLINE TIDEFLEX VALVE: <br />CONTRACTOR shall install inline check valves on outfalls as directed by OWNER. <br />Installation shall be paid for at the Contract Unit Cost Price as listed on the BID FORM. <br /> <br />N. ITEM NO. 14A, B, C, D, E, F, G, H, I – INSTALL ALUMINUM MANATEE GRATE: <br />CONTRACTOR to furnish all materials, labor, and equipment to construct and install