My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 01300 - 1 <br />SUBMITTALS <br /> <br />SECTION 01300 <br />SUBMITTALS <br />PART 1 - GENERAL <br />1.1 REQUIREMENTS INCLUDED <br />A. This section provides an overview of the submittals expected during the course of the <br />CONTRACT. All submittals, whether their final destination is to the OWNER, ENGINEER <br />or other representatives of the OWNER, shall be directed through the OWNER. This list <br />is not all inclusive, the OWNER, ENGINEER, Permitting Agencies or other specifications <br />throughout this contract may require additional submittals. Following is a general <br />summary of the types of submittals, format expected and the number of copies required: <br />Type of Submittal Number of Copies and Format to OWNER <br />Progress Schedule 1 PDF File <br />Schedule of Submittals 1 PDF File <br />Schedule of Values 1 PDF File <br />Hurricane Preparedness Plan 1 PDF File <br />24 Hr. Emergency Contact List 1 PDF File <br />Video Logs 2 Sets <br />Shop Drawings and Product Data 1 PDF File <br />Product Samples 2 Samples <br />Applications for Payment 1 Hard Copy; 1 PDF File <br />Daily Work Logs 1 PDF File <br />Certificates of Compliance 2 Originals <br />Warranties 2 Originals <br /> <br />1.2 SUBMITTAL PROCEDURES <br />A. Transmit each submittal with a form acceptable to the OWNER, clearly identifying the <br />project, the submittal number, the CONTRACTOR, the items included in the submittal, <br />corresponding specification sections and drawing sheet numbers, and other pertinent <br />information specified in other parts of this Section. <br /> <br />B. Revise and resubmit submittals as required. Identify all changes made since previous <br />submittals. Resubmittals shall be noted as such. <br /> <br />C. Distribute copies of reviewed submittals to concerned parties. Instruct parties to promptly <br />report any inability to comply with provisions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.