Laserfiche WebLink
  <br />CITY OF SUNNY ISLES BEACH SECTION 01300 - 7 <br />SUBMITTALS <br />  <br />E. Manufacturer's standard schematic drawings and standard printed recommendations for <br />application and use, compliance with standards, application of labels and seals, notation <br />of field measurements which have been checked, and special coordination requirements: <br /> <br />1. Modify drawings to delete information which is not applicable to the project. <br />2. Supplement standard information to provide additional information applicable to the <br />project. <br />F. Manufacturer's catalog sheets, brochures, diagrams, schedules, performance charts, <br />Illustrations and other standard descriptive data: <br />1. Clearly mark each copy to identify pertinent materials, products or models <br />2. Show dimensions and clearances required. <br />3. Show performance characteristics and capacities. <br />4. Show wiring diagrams and controls. <br /> <br />1.10 PRODUCT SAMPLES <br />A. Physical examples to illustrate materials, equipment or workmanship, and to establish <br />standards by which completed Work is judged. <br /> <br />B. Office samples of sufficient size and quantity to clearly illustrate: <br />1. Functional characteristics of products or materials, with integrally related parts and <br />attachment devices. <br />2. Full range of color samples. <br /> <br />C. Field samples and mock-ups: <br />1. Erect at the project site at a location acceptable to the OWNER. <br />2. Construct each sample or mock-up complete, including work of all trades required in <br />finished work. <br /> <br />1.11 APPLICATIONS FOR PAYMENT <br />A. Procedures for preparation and submittal of Applications for Payment must be in <br />accordance with the General Conditions. <br /> <br />B. Each Application for Payment must include a completed and executed City of Sunny Isles <br />Beach Application for Payment cover sheet. The Contractor may include AIA G702 –