Laserfiche WebLink
City of Sunny Isles Beach <br /> RFP 18-04-02 Disaster Debris Management and Disposal Services <br /> and operation or a reduction site, loading sites or any other work site. The Site Managers report directly to <br /> the Sector Manager, who reports to an Area Manager,who reports to a Project Superintendent, who reports <br /> to the Project Manager. Depending on the scale of a disaster, the number of managers assigned to the <br /> Ceres Team will vary depending on local conditions. Foremen at the reduction site(s) and for the collection <br /> and hauling activities are responsible for crew supervision and report to the Site Manager. <br /> Each Site Manager ensures that their crew operates in an efficient manner and is responsible for <br /> documenting and inspecting work performed. Site Managers document safety meetings, equipment safety <br /> inspections, quantity and location of debris hauled, areas completed, and daily time sheets of personnel <br /> and equipment. Site Managers also monitor quality control issues such as completeness of cleanup and/or <br /> trimming and contract compliance. <br /> The collection crew Foreman will be responsible for scouting future debris removal locations within the daily <br /> schedule set by the Program Manager. While scouting the zone, the Foreman's responsibilities include: <br /> • Locating logical trucking routes. • <br /> • Identification of Sections by Crew Type/Composition. <br /> o Locating and planning the control or elimination of hazards within the zone (such as high traffic <br /> areas). Preference will be given to Self Loaders to ease traffic congestion and minimize damage. <br /> e Advising the Site Manager of any anticipated difficulties or hazards. <br /> ▪ Determining and obtaining resources necessary to ensure a steady workflow. <br /> At the end of each shift, documentation of work completed will be tabulated by the administrative staff and <br /> used to schedule the next day's work activities. At this time, any daily reports required by the City will be <br /> produced. <br /> Scheduling Control Debris Collection <br /> During post-award preparation the Project Manager obtains maps detailed enough to provide individual <br /> debris collection crews address block information. Maps will be divided and identified according to Districts, <br /> Sections, and Developments or Address Blocks. The Master Debris Management Map will be located in <br /> the Emergency Response Mobile Command Center. Individual developments or address block maps will <br /> be reproduced on 8.5"x 11" paper for use in crew dispatching. Each Site Manager will be provided a binder <br /> • <br /> containing all of the development/address block maps for the event's entire area. <br /> The.Project Manager will be responsible for the assignment of Districts, Sections, and Developments or <br /> Address blocks to subcontractors and their respective crews. A written master assignment file will be <br /> maintained in the Emergency Mobile Command Center and will be updated as changes or additions are <br /> made. The dispatcher will be responsible for dispatching crews to their assigned areas utilizing the master <br /> assignment file. Subcontractors and their respective crews will not be permitted to have more than two <br /> open assigned areas. Communication between the subcontractors, their respective crews and the <br /> dispatcher will be via radio or telephone. Upon completion or near completion of an assignment, it is the <br /> responsibility of the crew leader or subcontractor to request an inspection. The dispatcher will forward this <br /> request to the debris collection superintendent or area manager for action. The debris collection <br /> superintendent or area manager will coordinate an inspection with a City designated representative. <br /> Once an assignment has been completed and inspected, a new area will be given to the subcontractor. <br /> Depending on the size of the subcontractor and/or crew, areas may be as small as address blocks or <br /> developments up to portions or even entire Sections. Crews will not be permitted to leave their assigned <br /> area and move to another work area until all work is completed as required and the area inspected and <br /> authorization received from the Site Manager. The dispatcher is responsible for continually updating crew <br /> locations. At the end of each shift, the dispatcher will provide the field managers with a list of crews and <br /> their current locations. Subcontractors and crews are prohibited from collecting debris from outside of their <br /> assigned areas. The City field representatives will be provided updated crew assignments daily. <br /> • Project Manager <br /> The Project Manager (PM) will serve as the principal point of contact between Ceres and the City <br /> Operations Manager. The assigned PM will be knowledgeable about all facets of Ceres' assigned tasks <br /> and will have executive project responsibilities. The PM will have written authority to sign for the corporation <br /> in matters relating to this project and the City. <br /> ETab 8 Project Understanding and Technical Approach <br /> ENVIRONMENTAL Section 1 Debris Management Operations Plan <br /> Page 8-8 <br />