My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CERES
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-04-02 Disaster Debris Management and Removal Services
>
Responses
>
CERES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 1:57:44 PM
Creation date
5/10/2018 3:33:08 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Disaster Debris Management
Bid No. (xx-xx-xx)
18-04-02
Project Type (Bid, RFP, RFQ)
RFP
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach <br /> RFP 18-04-02 Disaster Debris Management and Disposal Services <br /> 410 Debris Training Program Description <br /> This section discusses the training requirements for all Ceres employees regarding Debris Removal and <br /> DMS Management, known as "Debris Training." <br /> • <br /> The Project Manager or his designee is responsible for the following: <br /> • Implement and administer initial and refresher training programs. <br /> • Determine the appropriate facility-specific training and/or orientation/briefing needed for each <br /> employee. <br /> • Ensure employees attend required facility specific training and/or orientation/briefing. <br /> • Ensure employees are assigned positions for which they have received training and/or <br /> orientation/briefing. <br /> Project First Line Managers/Foremen are responsible for the following: <br /> • Determine the appropriate facility specific training needed for each employee. <br /> • Ensure employees are only assigned positions for which they have been trained or <br /> orientated/briefed, as applicable. <br /> Initial Training Requirements <br /> There are no educational or experience entry requirements for Debris Training. Comprehension of the <br /> English language is required to attend the Debris Training. Comprehension is validated by the successful <br /> completion of this training program. <br /> The first step in Debris Training is the designation of an employee as a Debris employee. <br /> Training Program Description <br /> The Initial Debris Training Course uses a qualification card that includes a required 90-minute training <br /> session that covers review of the FEMA Debris Management training book E/G202, Units 7 and 8 <br /> (respectively "Debris Management Site Evaluation and Operation" and "Debris Monitoring") and an initial <br /> safety indoctrination. <br /> ',,,1 Debris Training must be completed prior to assignment and at least every two years thereafter. After the <br /> initial 90-minute training/orientation, further project-specific training is conducted by the employee's <br /> immediate supervisor and is conducted on-the-job. <br /> Facility specific training will be conducted regarding the TDSR Site. Topics will include: Fire Prevention, <br /> Spill Prevention, Hazardous Materials Handling, Safe Operation of Heavy Equipment, Personal Protective <br /> Equipment, and Activity Hazard Analysis training. <br /> Job Descriptions that require specific training are as follows: <br /> v-- PR(LIFcT_Si IPFRINTFNI'1Ft�T L c <br /> Trained by the Project Manager: Safety <br /> • Traffic Control <br /> Additional training includes:-- Documentation(Reports) • Personnel Management <br /> • Work location • Debris Segregation <br /> Hazardous Waste • Contract information • Collection <br /> • Identifying household and other • Daily&cumulative hours • • Grinding and Hauling Operations <br /> hazardous waste __,__ — Equipment usage CERES_020 <br /> • Segregation and handling of — Man-hours <br /> materials in accordance with — Cubic yards collected per <br /> contract requirements assigned area <br /> 0 <br /> E EEo-'�,.,e N TA L Tab 8 Project Understanding and Technical Approach <br /> Section 1 Debris Management Operations Plan <br /> NVIRMPage 8-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.