Laserfiche WebLink
City of Sunny Isles Beach <br /> RFP 18-04-02 Disaster Debris Management and Disposal Services <br /> Debris Management Sites (DMS) . . <br /> When a DMS is established, a Site Plan will be developed for each site, and include, but not be limited to: <br /> • A description of project operations <br /> • Site layout <br /> • Environmental factors <br /> • Site photographs <br /> Additional sub-plans that may be incorporated as necessary in the Site Plan include: <br /> • An Environmental Protection Plan that addresses storm water protection, hazardous waste, soil <br /> and leachate draining from the debris stockpiles, site operations, and the proximity of truck traffic <br /> to waterways. <br /> • A Dust Control Plan that will address prevailing wind directions and location of developed areas <br /> as it relates to site design. Methods of mitigation will be specified such as the use of water trucks <br /> on access roads. <br /> • A Traffic Control Plan that <br /> considers the number of trucks per 4; <br /> hour entering the DMS and the type . .cep x <br /> of public access control (if � � ` ,,h " <br /> authorized). All-weather access <br /> roads into and out of the site will be 4 g <br /> needed to maintain a 'seven-day tr t pp,�AA�. <br /> J d13'y }'Y iA ' ` �,�i UGi: , '.�. Rwry'- <br /> per week operation. �.' .f � � & <br /> • A Site Safety Plan that complies .' Y,j� i '� 1 ".1—.1 ~ <br /> with the Ceres Company Accident '�<<---,II fi�f=– °` ,m� ` <br /> Prevention Plan (available on ff� ' <br /> request) and applicable OSHA ...–:T..-.',4' <br /> ..T „ I <br /> requirements. Security will also be ~, .� , 4i <br /> addressed in the Site Safety Plan. 1= ' 7,*:","*' .^ '.5:-:',10!:'. °a, <br /> • A Fire Prevention Plan that will A water truck sprinkling to control dust on an access road. III <br /> follow the provisions of the National <br /> Fire Prevention Code and in particular, codes that specifically address woodchip storage. All <br /> equipment will have fire extinguishers that meet NFPA No. 10A-1970. <br /> • The Production Plan will designate how machinery will be utilized on site and will describe site <br /> management/operations and anticipated production rates. Each load received at the site will be <br /> inspected prior to off-loading to determine load size and •the presence and type of any <br /> contaminants. Contaminated loads will be segregated for further sorting and appropriate <br /> processing or disposal. <br /> ▪ Other plans may include: Truck Routes and Access; Site Staffing and Assigned Duties; Debris <br /> Segregation and Hazardous Waste Handling plans. <br /> DMS Construction Timeline <br /> Each designated Debris Site Manager will commence construction of their respective DMS within 24 hours <br /> of notification. DMSs will be fully operational within 48-72 hours of Notice to Proceed. The Project Logistics <br /> Manager is responsible for ensuring gravel for access and internal haul roads and dump pads, prefabricated <br /> inspection tower kits, erosion control materials such as silt fence, straw bales, coir fiber, and geo-membrane <br /> liners for hazardous waste containment areas are available on site within 24 hours of notification. <br /> Additionally, portable truck scales may also be requested at the direction of the City. <br /> Demobilization Phase <br /> The PM prepares a demobilization checklist that includes a punch list of items to be completed by staff. <br /> The Punch List may include items such as arrangement for future maintenance of erosion control measures. <br /> The PM and staff are also responsible for final report to the City which includes lessons learned and results <br /> of operations <br /> (E((�J==�� Tab 8 Project Understanding and Technical Approach <br /> Section 2 Understanding of the Services and Support <br /> ENVIRONMENTAL <br /> Page 8.2-6 <br />