My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Disaster Program & O perations Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-04-03 Disaster Debris Monitoring Services Financial Recovery Assistance
>
Responses
>
Disaster Program & O perations Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 4:40:30 PM
Creation date
5/10/2018 4:06:39 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Disaster Debris Monitoring Svcs & Financial Recovery Assist
Bid No. (xx-xx-xx)
18-04-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Time Task .Deliverables/Milestone - -- <br /> Pre-Disaster,Non-Billable Items'(Preparedness and Mobilization Strategy) _. <br /> H-96 Review capabilities and ensure adequate resources • Contact the City and initiate a communications schedule <br /> • Review the City debris plan and prepare assets for activation. <br /> 96Hours:96 Hours • Verify SWA TDRS Permit,Site status,Activation <br /> 41kefore disaster) • Discuss deploying project manager of the City <br /> • Maps Review and Priority Routes(Construction) <br /> • Run initial models to estimate impact and resource needs (Travel <br /> Logistics). <br /> • Communications Capability(Satellite) <br /> • Contact pre-screened City debris monitoring workforce <br /> H-72 ADMS equipment,monitor forms.all Debris • Verify and update staff and quantities mobilization. <br /> Supervisors and Monitoring staff notification and check <br /> in. <br /> H-48 Monitor storm track and continue preparations • Continue communications with College staff <br /> • Confirm staging location to mobilize resources <br /> • Prepare project assets and begin base camp logistics coordination <br /> (Personal Protective Equipment) <br /> H-24 Prepare final reports • Certify emergency road clearance equipment(in coordination with the <br /> debris removal contractor) <br /> • Coordinate documentation of emergency push activities. <br /> j-1:14 Response_&Mobilization - • - --- • —f <br /> H+12 Hrs. Within 12 Hours of Notice to Proceed(NTP) • Mobilize DP&O Project Manager and other key staff <br /> (12Hours post <br /> disaster) <br /> 11+24 Hrs. Commence work per City work orders • Begin 70-hour emergency push and restore critical roadway passage. <br /> Mobilize to Field Operations Center(FOC)Debris • Begin post 70 hr.emergency road clearing per City DMP. <br /> Monitor Supervisors.Monitors and ADMS equipment • Document time and materials <br /> for Emergency Road Clearing • Coordinate with EMC staff to conduct preliminary damage assessments <br /> if requested <br /> • Begin mobilizing DP&O pretrained local monitors <br /> • Initiate debris management site(DMS)opening <br /> H+48 Hrs. Emergency Road Clearing/Damage Assessment • Continue emergency push <br /> • Continue preliminary damage assessment <br /> • Develop debris cost estimate for the City <br /> 11+72 Hrs. Disaster Debris Vehicle Certification/Site Preparation • Certify disaster debris vehicles <br /> • Verify DMS Site permits and operations. <br /> • Verify disposal site availability and possible delays <br /> • DMS towers and establish site flow if required due to deficiency <br /> • Conduct training/safety sessions for monitors <br /> • Open public drop-off sites if requested <br /> 11+96 Hrs. Begin Debris Collection Monitoring Per work orders • Assign monitors to load haul crews,leaner and hanger removal crews. <br /> obtained from FOC • Assign monitors to DMS locations <br /> • Assign supervisors to monitors per debris zones <br /> • Meetings with all stakeholders as requested. <br /> • Implement QAQC of leaner hanger photos and ticket processing <br /> • Initiate daily.ticket reconciliation with debris removal contractor <br /> PHASE IT Recovery(Debris Hazards Removal;Debris,Management) - <br /> Week 1+through ROW Debris Collection Monitoring per work orders • Continue ROW debris collection <br /> project completion obtained from FOC • Issue daily reports/GIS maps <br /> • Hold daily meetings with the City and debris removal contractors as <br /> required <br /> • Provide citizens/community debris management hotline(if requested) <br /> • Determine which special projects are required (hazardous trees, <br /> waterway debris removal, private property debris removal, etc.) and <br /> prepare eligibility request <br /> • Implement QAQC of leaner hanger photos and ticket processing <br /> • Initiate daily ticket reconciliation with debris removal contractor <br /> Week 1+ Documentation Management • Provide ADMS reports real-time monitoring access <br /> • Daily Reporting of quantity and cost <br /> • Review truck metrics and inefficiencies provided by ADMS- <br /> • Obtain Force labor,equipment.rented materials(if used)and reconcile <br /> with backup daily logs.Reconcile all contractor invoice&ticket ledgers <br /> with City Payments. <br /> 410 <br /> Disaster Program &Operations, Inc. Request for Proposals Disaster Debris Monitoring No. 18-04-03 <br /> 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.