Laserfiche WebLink
• <br /> caps and panels. The stucco finish panels will have an inset pattern created with a form liner. RJ Behar <br /> will present two alternative designs for consideration;cast in place and precast. The proposal also includes <br /> special details to address conflicts with utilities or drainage structures. <br /> Utility Coordination — RJ Behar will submit the plans for the utilities to mark the location of utilities and <br /> include their location in the contract drawings. The utilities will be identified through the Sunshine Call <br /> design ticket. RJ Behar will conduct a meeting to coordinate any utility conflicts and resolutions. <br /> • <br /> 1.4 Construction Plans$ 14,225.00 <br /> Plans will be prepared on In AutoCAD format. They should include the following: <br /> • <br /> • Titie,Location map <br /> • <br /> • General Notes <br /> • Plan and Elevation Layout <br /> • Structural Wall Design Details(footings,expansion joints,wall drainage, etc.) <br /> • Special details(conflicts, aesthetics,etc.) <br /> 1.5 Specifications $868.00 <br /> The specifications for the project shall be prepared to include all construction items as well as any special <br /> • <br /> features. They will be prepared in CSI format. <br /> 1.6 Cost Estimates$1,289.00 <br /> A preliminary cost estimate will be included for the cast in place and the precast alternatives.Additionally a <br /> cost estimate will be prepared during final design phase to allow the City to compare with Contractor's bid <br /> proposals. The estimate will be based on historical unit pricing and the quantities take-off from the plans. It <br /> should include all the major items of construction and consider the complexity of the construction. <br /> 1.7 Coordination &Meetings $692.00 <br /> Two(2)meetings are expected with the City staff to discuss the plans. Also coordination time is expected <br /> • <br /> thru e-mail and telephone conversations throughout the project duration. <br /> • <br /> 1.8 Permits $ 1,214.00 <br /> RJ Behar will complete the building permit package, submit, and track the permit progress.This will include <br /> the FDOT, Miami Dade County and the City of Sunny Isles Beach. <br /> 1.9 Bid and Award Support$516.00 <br /> RJ Behar will fumish the Contract Documents to the City for bidding, attend a Pre-Bid Conference, address <br /> any inquiries from bidders,and issue addenda as required. <br /> Statement of Work <br /> Proposed Privacy Wall North of 192 St Page 2 <br />