My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2037
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2013 10:59:36 AM
Creation date
3/22/2013 4:50:16 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2037
Date (mm/dd/yyyy)
03/21/2013
Description
Agmt w/RJ Behar & Co Engineer Srvs for Wall under Wm. Lehman Cswy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 SOUTH FLORIDA <br /> emne.s®.n i aow tmo i moe..m <br /> January 29,2013 <br /> R J Behar& Company, Inc. <br /> 6861 SW 196th Avenue, Suite 302 <br /> Pembroke Pines, FL 33332 <br /> Attn: Mr.Juan Varquez, P.E. <br /> Re: Proposal for Geotechnical Services <br /> Sunny Isle Privacy Wall <br /> Sunny Isle,Florida <br /> TSF Proposal No.: 1301-054 <br /> Dear Juan: <br /> As requested, TIERRA SOUTH FLORIDA, INC. (TSF) is pleased to submit this proposal for <br /> the above-referenced project. This proposal includes an outline of our proposed scope of work, <br /> an estimate of the total fees, and our anticipated schedule for completion of the work. <br /> PROPOSED SCOPE OF WORK <br /> Based on the information provided to us by R J Behar & Company, we understand that the <br /> proposed wall will be about 1,191 feet long and about 8 feet high. <br /> To explore the subsurface conditions, we propose to drill 6 SPT borings in this area. The borings <br /> will be extended to a depth of 30 feet below existing grades. Boring locations will be <br /> approximately located and noted in the field by our personnel by measuring distances with a tape <br /> from known reference points. Elevations at boring locations can be interpreted from topographic <br /> plans if famished by others. Prior to drilling at the project site, TSF will notify the local utility <br /> companies and request that underground utilities be marked. Our experience, however, is that <br /> the utility companies will not mark privately owned utilities. Our proposal assumes that private <br /> utility lines will be located in the field by others prior to mobilization of the drill rig. TSF will <br /> recommend a utility line locating service upon request. <br /> Upon completion of the field exploration, laboratory testing will be performed on selected <br /> samples. <br /> 2765 VISTA PARKWAY,SUITE 10 WEST PALM BEACH. FLORIDA 33411 <br /> (561)687-8539•FAX(561)687-8570 <br /> State ofFbnda hofeuJonaJ Emir gets theme#18073 <br />
The URL can be used to link to this page
Your browser does not support the video tag.