My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2037
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2013 10:59:36 AM
Creation date
3/22/2013 4:50:16 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2037
Date (mm/dd/yyyy)
03/21/2013
Description
Agmt w/RJ Behar & Co Engineer Srvs for Wall under Wm. Lehman Cswy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• R J Behar&Company 2 <br /> TSF Proposal No. 1301-054 <br /> A geotechnical engineer will evaluate the results of all drilling and laboratory testing. A report <br /> will be issued that contains the exploration data, a discussion of the site and subsurface <br /> conditions, evaluation, recommendations for foundation design and some construction <br /> consideration. <br /> ESTIMATED FEES <br /> It is proposed that the fee for the performance of the services outlined above is a lump sum of <br /> $6,045.00 and that the work is performed pursuant to the TSF General Conditions enclosed <br /> herewith and incorporated into this proposal. <br /> Our estimate covers the work needed to present our findings and recommendations in a formal <br /> report. Not included are reviews of drawings, preparation of construction specifications, special <br /> conferences and any other work requested after submittal of our report. <br /> SCHEDULE AND AUTHORIZATION <br /> TSF will proceed with the work after receipt of a signed copy of this proposal. With our present <br /> schedule, we can commence work within a few days of project approval (weather permitting and <br /> utility clearance). The fieldwork is expected to take about two days to complete. The written <br /> report can be submitted about one week after completion of the field exploration, depending on <br /> the extent of the laboratory-testing program. Verbal preliminary recommendations can be made <br /> to appropriate parties prior to submittal of the written report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.