My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSIB-98073000
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(0098-07-30) City of SIB Government Center, Police Facility and Library
>
CSIB-98073000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2013 2:17:54 PM
Creation date
3/25/2013 11:09:59 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Government Center
Bid No. (xx-xx-xx)
98-07-30
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[ HEWETT-KIER CONSTRUCTION, INC. GENERAL CONTRACTORS <br /> GOVERNMENT CENTER, POLICE FACILITY & LIBRARY— <br /> FOR CITY OF SUNNY ISLES BEACH, FLORIDA <br /> REQUEST FOR QUALIFICATIONS— CSIB-98073000 <br /> DI. PROFILE— REQUIRED SUBMITTALS: <br /> G. - MINORITY BUSINESS PLAN (Continued) <br /> CLAUSE FLOW DOWN: <br /> Hewett-Kier Construction, Inc. will utilize Small, Small Disadvantaged and Women- <br /> Owned Small Business Concerns in all of the subcontracts that offer further <br /> subcontracting opportunities. All subcontractors, except small business concerns, that <br /> receive subcontracts in excess of $500,000.00 ($1,000,000.00 for construction) will be <br /> required in their contract to adopt and comply with a plan similar to the plan required by <br /> "Small, Small Disadvantaged and Women-Owned Small Business Subcontracting Plan". <br /> REPORTING AND COOPERATION IN STUDIES AND SURVEYS: <br /> Hewett-Kier Construction, Inc. will submit required reports and cooperate in any studies <br /> or surveys as may be required by the contracting agency or SBA in order to determine the <br /> extent of compliance with the subcontracting plan. Subcontracting reports will be <br /> prepared on SF-294, Subcontracting Report for Individual Contracts and SF-295, <br /> Summary Subcontract Report as appropriate. Reports will be submitted no later than <br /> thirty (30) days after the applicable reporting period as indicated on each form. The SF- <br /> 294 report will be submitted directly to the contracting agency. Periodic reports, as may <br /> be required, will be submitted to demonstrate compliance with the plan. Large <br /> subcontractors will be required, by contract, to submit SF-294 and SF-295 reports. <br />
The URL can be used to link to this page
Your browser does not support the video tag.