Laserfiche WebLink
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES <br />UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />Reference No. 3 <br /> <br />a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address: <br />Mr. Patrick MacGregor <br />Expansion Coordinator <br />Broward County Water and Wastewater Services <br />2555 West Copans Road <br />Pompano Beach, Florida 33069 <br />Phone: (954) 831-0904 / Fax: (954) 831-0798 <br />Email: pamacgregor@broward.org <br />b. Project Title: <br />North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package <br />11, Pompano Beach, Florida <br />c. Description of Work performed, including the project location: <br />The infrastructure improvements to the existing neighborhood included new roadway, <br />sidewalk drainage, swale regrading, landscaping, water, sanitary sewer, and signage, <br />Bid Package 11 was the final area in the North County Neighborhood Improvement, NE <br />Quadrant. The area is primarily residential that was developed in the 1950’s. The <br />existing infrastructure was longer suitable to meet the current standards for water and <br />sanitary sewer facilities. The Project was completed under budget and on time. The <br />North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid <br />Package 11 included approximately 357 acres of land between Dixie Highway and <br />Federal Highway, north of Sample Road in Broward County. The project included over <br />50,688 linear feet of new roadway construction, sidewalks, driveway aprons, and <br />sodded swales In addition the project included over 14,777 linear feet of new storm <br />sewer, 12,993 linear feet of exfiltration trench, 64,000 linear feet of water main, 553 <br />Water Services (many of these services were moved from the rear of the lot to the <br />front), 49,700 linear feet of reuse water main, 796 reclaimed water services, 43,805 <br />linear feet of gravity sewer main, 750 sewer laterals, lift station, and 1,630 linear feet <br />of force main. CTA provided surveying, civil engineering, landscape architecture and CEI <br />services on the project. <br />d. Year Completed: <br />2014 <br /> <br /> <br /> <br />F | Page 4