My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craven Thompson & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 10:22:51 AM
Creation date
9/6/2018 10:19:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES <br />UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />Reference No. 6 <br />a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address: <br />Mr. Alan Garcia, P.E. <br />Director of Water & Wastewater Operations Division <br />Broward County Water & Wastewater Services <br />2555 West Copans Road <br />Pompano Beach, Florida 33069 <br />Phone: (954) 831-0747 / Fax: (954) 831-0798 <br />Email: agarcia@broward.org <br />b. Project Title: <br />North County Neighborhood Improvement, NW Quadrant, Broward County <br />c. Description of Work performed, including the project location: <br />The North County Neighborhood Improvement Project, Northwest Quadrant includes <br />land between Dixie Highway and I-95, North of Sample Road, in the City of Deerfield <br />Beach. This area is primarily residential, built in the 1950’s and early 1960’s. The area <br />was developed with limited sanitary sewer system, no drainage and an inadequate and <br />now aged water distribution system. project which includes approximately 650 acres of <br />land between Dixie Highway and I-95, North of Sample Road, Roadway improvements <br />included 115,596 linear feet of roadway, along with 104,637 linear feet of sidewalk, <br />and storm sewer included 17,006 linear feet of pipe, and there were 33,191 linear feet <br />of exfiltration trench. Additionally, the sanitary sewer collection system consisted of <br />70,783 linear feet of gravity main, 14,253 linear feet of force main, and four (4) lift <br />stations. The water distribution system additions included 86,112 linear feet of <br />watermain and 1,590 water services CTA provided topographic survey, design, <br />permitting landscape architecture, and construction engineering and inspection <br />services. <br />d. Year Completed: <br />2014 <br /> <br />F | Page 7
The URL can be used to link to this page
Your browser does not support the video tag.