My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Kimley-Horn & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 10:42:41 AM
Creation date
9/6/2018 10:38:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kimley-horn.com 1920 Wekiva Way, Suite 200, West Palm Beach, FL 33411 561 845 0665 <br />August 23, 2016 <br />Ms. Patricia Strayer, P.E. <br />Town of Palm Beach <br />951 Old Okeechobee Road, Ste. "A" <br />West Palm Beach, FL 33401 <br />RE:Town-Wide Undergrounding of Utilities Program: Master Plan Finalization <br />Dear Patricia, <br />The Kimley-Horn and Associates, Inc. team (Kimley-Horn) is pleased to submit this proposal to the <br />Town of Palm Beach (“TOWN”) for providing engineering services related to the master planning phase <br />of the Town-wide Undergrounding of Utilities Program. Our project understanding, scope of services, <br />schedule, and fee follow. <br />Project Understanding <br />The Town previously authorized Kimley-Horn to prepare a master plan for the first half of the Town- <br />wide Undergrounding program. At the August 2016 Underground Utilities Task Force (UUTF) meeting, <br />it was recommended by the UUTF that Kimley-Horn prepare the total master plan instead of only the <br />first half of the program. <br />There are inherent efficiencies in completing the master plan document at one time. Many of the <br />activities and elements to be contained in the first half of the master plan need only be expanded to <br />contain information related to the phases that make up the second half of the program. For this reason, <br />we anticipate additional effort to complete the second half of the master plan in the following areas only: <br />· Conceptual Plans for Significant FP&L, AT&T, and Comcast Infrastructure <br />· Engineer’s Conceptual Opinion of Probable Construction Cost <br />· Master Schedule and Sequencing Plan <br />· Assessment of Traffic Impacts <br />· Project Delivery Method Recommendations <br />All services described in the Scope of Services below are exclusively for the completion of the second <br />half of the master planning process. Based on this understanding, our detailed scope of services is <br />provided below. <br />Scope of Services <br />Conceptual Plans for Significant FP&L, AT&T, and Comcast Infrastructure <br />Kimley-Horn will develop an overall conceptual plan of the significant infrastructure for ATT, FPL, and <br />Comcast in GIS format. The GIS Maps will contain information as described in Task 1.2.2 of our original <br />authorization.
The URL can be used to link to this page
Your browser does not support the video tag.