My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />M.S. Environmental Engineering <br />Florida International University <br />B.S. Civil Engineering <br />Florida International University <br />A.A., Miami -Dade Colle <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer <br />State of Florida <br />License No. 55459 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/f <br />Applicable) <br />ake Osborne Estates Water Main Improvements <br />p <br />Ongoing <br />Ongoing <br />ake Worth, Florida <br />e <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Engineering design for proposed Phase I of Lake Osborne Estates serving 228 residences. <br />Approximately 16,400 LF of water main ranging in size from 4" to 8" is proposed. <br />Design costs total $183,747. <br />1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />W 2nd Street Drainage Improvements <br />ompano Beach, Florida <br />Ongoing <br />Ongoing <br />b <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />ngineering design for proposed drainage improvements of SW 2nd Street, SW 1St <br />Avenue and SW 1St Terrace. Design costs total $143,833. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />Acreage Community Park South Expansion <br />ndian Trail Improvement District <br />2016 <br />Ongoing <br />West Palm Beach, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />ngineering design, bidding and construction services for proposed development of a <br />ulti-phase 29 acre community park. Improvements included the design of water, <br />ewer, and drainage infrastructure for the park. Construction costs were $3.5 million. <br />1) TITLE AND LOCATION (Cityand State) (2) YEAR <br />COMPLETED <br />CONSTRUCTION (lfApplicable) <br />PROFESSIONAL SERVICES <br />lades Road Improvements <br />ank of America 2016 <br />On-going <br />d <br />oca Raton, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />edevelopment of a 4.7 acre existing bank site. Services provided included engineering <br />esign of a 200 linear foot water main relocation, paving, grading and drainage <br />mprovements. Permitting, construction management and inspection services were als80 <br />rovided. Construction costs for the civil related improvements were $575,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.