Laserfiche WebLink
12. NAME 13. ROLE IN THIS CONTRACT <br />Al Caruso, E.I. Engineering - Project Engineer a. TO27 TAL <br />15. FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Associates Degree in Engineering, 1978 <br />Technology Middlesex County College, <br />New Jers <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRM <br />20 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If <br />Applicable) <br />Wastewater Pump Station No. 3 &Gravity Sewer <br />2017 <br />2018 <br />Bal Harbour, Florida <br />a <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Designer: Construction of new triplex submersible pump station with 12 -foot <br />diameter wet well, control panel, automatic transfer switch receptacle, on-site <br />emergency generator, electrical upgrades and all associated appurtenances and <br />approximately 1,350 linear feet of 18 -inch gravity sewer lines to pump station. Services <br />include survey, utility locates, design, permitting, preparation of construction plans and <br />contract documents, bidding, and construction management. (Responsible for the <br />design of the gravity sewer lines.) Construction cost $2,968,730 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />Sewer Force Main Replacement <br />Margate, Florida <br />2013 <br />2014 <br />b <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Designer: Replacement of an existing 12 -inch ACP force main with a new, <br />upsized sewer force main. The work included the installation of approximately 5,060 <br />LF of DIP force main ranging in size from 6 -inch to 20 -inch, 140 LF of encased jack and <br />bored pipe under State Road 7, 950 LF of directional drilled HDPE pipe under an <br />existing canal, connection to an existing lift station, abandonment of the existing force <br />main, and road and swale restoration. The project was installed from the City's <br />wastewater treatment plant to an existing force main tie-in on State Road 7. Project <br />cost $1,449,900 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />Collins Avenue 12" Water Main Replacment <br />Bal Harbour, Florida <br />2011 <br />2013 <br />C <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Designer: Responsible for design, permitting, contract document development, <br />bidding services, construction management/inspection and certification through <br />project close-out for installation of 1,800 linear feet of horizontal directionally drilled <br />12" HDPE water main and 680 linear feet of 12" DIP water main including five (5) fire <br />hydrants and nine (9) tie-in connections to existing water mains. Construction costo <br />$558,590 <br />