12. NAME 13. ROLE IN THIS CONTRACT
<br />Al Caruso, E.I. Engineering - Project Engineer a. TO27 TAL
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Craig A. Smith & Associates, Inc.
<br />Boca Raton, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Associates Degree in Engineering, 1978
<br />Technology Middlesex County College,
<br />New Jers
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRM
<br />20
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If
<br />Applicable)
<br />Wastewater Pump Station No. 3 &Gravity Sewer
<br />2017
<br />2018
<br />Bal Harbour, Florida
<br />a
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Designer: Construction of new triplex submersible pump station with 12 -foot
<br />diameter wet well, control panel, automatic transfer switch receptacle, on-site
<br />emergency generator, electrical upgrades and all associated appurtenances and
<br />approximately 1,350 linear feet of 18 -inch gravity sewer lines to pump station. Services
<br />include survey, utility locates, design, permitting, preparation of construction plans and
<br />contract documents, bidding, and construction management. (Responsible for the
<br />design of the gravity sewer lines.) Construction cost $2,968,730
<br />1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (lfApplicable)
<br />Sewer Force Main Replacement
<br />Margate, Florida
<br />2013
<br />2014
<br />b
<br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Designer: Replacement of an existing 12 -inch ACP force main with a new,
<br />upsized sewer force main. The work included the installation of approximately 5,060
<br />LF of DIP force main ranging in size from 6 -inch to 20 -inch, 140 LF of encased jack and
<br />bored pipe under State Road 7, 950 LF of directional drilled HDPE pipe under an
<br />existing canal, connection to an existing lift station, abandonment of the existing force
<br />main, and road and swale restoration. The project was installed from the City's
<br />wastewater treatment plant to an existing force main tie-in on State Road 7. Project
<br />cost $1,449,900
<br />1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (lfApplicable)
<br />Collins Avenue 12" Water Main Replacment
<br />Bal Harbour, Florida
<br />2011
<br />2013
<br />C
<br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Designer: Responsible for design, permitting, contract document development,
<br />bidding services, construction management/inspection and certification through
<br />project close-out for installation of 1,800 linear feet of horizontal directionally drilled
<br />12" HDPE water main and 680 linear feet of 12" DIP water main including five (5) fire
<br />hydrants and nine (9) tie-in connections to existing water mains. Construction costo
<br />$558,590