108 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES ' <br />CONSTRUCTION (If <br />Applicable) <br />SW 281h Street & 3rd Terrace Roadway <br />2016 <br />2018 <br />Okeechobee County, Florida <br />C _j <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer: This particular area of Okeechobee experienced noticeable roadway <br />settlement at fourteen locations along an existing gravity storm system. Custom <br />construction details were produced to clearly define the scope for each trench <br />restoration area. A valley gutter was also installed in swales to allow runoff to flow <br />into existing inlets and keep water from ponding on driveways. Construction cost <br />$400,000 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES I <br />CONSTRUCTION (If <br />Applicable) <br />Wauchula Hills Phase 4.0 Water & Sewer <br />Improvements <br />d <br />Hardee County, Florida <br />2016 <br />2017 <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer: Wauchula Hills is a very old neighborhood with residences on both <br />well and septic tanks, eventually resulting in high levels of groundwater <br />contamination. The scope of this project includes designing a gravity sewer collection <br />system to tie into an existing system and expanding on an existing water main system <br />to service the rest of the neighborhood. Construction cost $1,249,012 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (IfApplicable) <br />Avenue L, M, N & 4 th Street Gravity Sanitary <br />Sewer, Force Main & Lift Station Improvements <br />2015 <br />2016 <br />e <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer: Construction of duplex submersible lift station with an 8 -foot <br />diameter wet well and approximately 350 LF of 6" force main along with 6,344 LF of <br />associated 8" and 10" gravity sewer line. Services included survey, design, permitting, <br />preparation of construction plans and contract documents, bidding and construction <br />management. Construction cost $1,286,627 <br />108 <br />