My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Keith Schriner Project / Field Engineer a. TOTAL b. WITH CURRENT FIRM <br />2 2 <br />15. FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Bachelor of Science, Civil Engineering, <br />2013 <br />University of Central Florida, Orlando, <br />Florida <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />107 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/f <br />Applicable) <br />2018 Watermain Improvements - Phase II <br />p <br />Ongoing <br />Ongoing <br />Margate, Florida <br />a <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer: Responsible for the design, preparation of construction plans and <br />contract documents, permitting, bidding, construction management and limited <br />construction observation through project closeout/start-up services for the <br />replacement of 2" galvanized steel water mains with 6" DIP water mains at fifteen (15) <br />different locations throughout the city's service area (approximately 12,000 LF), <br />including GPR utility locates, test hole investigations, water service line placements, <br />ACP removal, fire hydrant replacement, fire hydrant spacing analysis and valve <br />shutdown plan. Design cost $212,280, Estimated construction cost $1,834,400 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/f <br />Applicable) <br />b <br />Spring Lake Improvement District - WWTP & <br />p g p <br />Wastewater System Improvements <br />Sebring, Florida <br />Ongoing <br />Ongoing <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer: Responsible for the design for the construction of an 80,000 GPD <br />extended aeration activated sludge wastewater treatment plant with absorption bed <br />effluent disposal system including a sanitary sewer lift station and an 8"/10" force <br />mains to the new WWTP site. Project includes survey, utility locates, geotechnical <br />investigation, environmental assessment permitting, contract document development, <br />bidding assistance, construction management and inspection through project <br />closeout. (Project is 100% SRF funded.) Design and construction management cost <br />$450,510, Construction cost $2.8 Million <br />107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.