My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tony Gomes <br />15. FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />A.A. Business Management <br />University of Massachusetts, Amherst <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Survey Courses - University of Miami <br />Licensure - Asphalt Plant Tech FDOT #R-1712, Asphalt Roadway Tech FDOT #5659 <br />19. RELEVANT PROJECTS <br />113 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/f <br />Applicable) <br />olden Beach Capital Improvement Project <br />2012 <br />2012 <br />olden Beach, Florida <br />a <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation/inspection of $17.5M project including <br />tormwater, water main, electrical, pavement, sidewalk and landscaping improvements. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />Bal Harbour Sanitary Improvements Phase I <br />al Harbour, Florida <br />2016 <br />2017 <br />b <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />esponsible for daily construction observation/inspection for the installation of a triplex <br />ubmersible lift station and 1,350 linear feet of 18" gravity sewer main. Total <br />onstruction costs were $2,970,000. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />tormwater Ponds Bank Repairs <br />Walnut Creek Community Development District <br />2018 <br />2018 <br />WCDD) Pembroke Pines, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE XCheck if project performed with currentfirm <br />esponsible for daily construction observation/inspection of 18,216 linear feet of <br />eofabric tubes, 103,000 plants and 15,000 square yards of sod. Construction cost were <br />594,600. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />E 174th Street Stormwater and Pavement <br />mprovements <br />2012 <br />2017 <br />d <br />3unny Isles Beach, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />esponsible for daily construction observation/inspection, pay applications and project <br />closeout for the restoration of 0.2 miles of roadway and drainage improvements. <br />onstruction costs totaled $2.14 million. <br />113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.