Laserfiche WebLink
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />NE 174th Street Stormwater and Pavement Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Sunny Isles Beach, Florida I 2014 1 2016 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT C. POINT OF CONTACT TELEPHONE NUMBER <br />City of Sunny Isles Beach Elka Linton -Dorsett (410) 979-7305 <br />Capital Proiects Manaoer <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, andcost) <br />Survey, utility locates, preparation of engineering design and construction plans, stormwater modeling and <br />calculations, cost estimates, contract documents and permitting for the Roadway Improvements Project for NE <br />174th Street. The project consists of a reconstruction of both the drainage and the road for approximately 0.2 miles <br />from Collins Avenue to North Bay Road. The existing roadway system was failing due to poor soil conditions, a <br />limited drainage system and an undersized outfall. The new roadway incorporated a reconstructed base with <br />geotech fabric to offset the soils. The design also included a new drainage system that meets water quality <br />requirements, site demolition, road regrading, fibre optic relocation, future conduit for telecom lines, sidewalks and <br />paver walkways, landscaping, curbing, bike paths and parallel parking. The design was completed within two <br />years, under budget, at a cost of $212,180. Construction of the first half of the project has been competed in 2016 <br />with an estimated cost of $2,147,800. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />{ ' ate` <br />a. <br />Craig A. Smith & Associates, <br />Boca Raton, Florida <br />Prime Consultant <br />Inc. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />C. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />a. <br />Craig A. Smith & Associates, <br />Boca Raton, Florida <br />Prime Consultant <br />Inc. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />C. <br />114 <br />