Laserfiche WebLink
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Water Main Replacement PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Bal Harbour, Florida 2011 2013 <br />23. PROJECT OWNER'S INFORMATION <br />j. PROJECTOWNER k. POINT OF CONTACT I. POINT OF CONTACT TELEPHONE NUMBER <br />Bal Harbour Village John Oldenburg (305) 866-4633 <br />Director of Parks & Public Spaces <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Survey, utility locates, preparation of engineering design and construction plans, permitting, cost estimates, <br />contract documents, bidding, construction management and construction observation, and certification through <br />project close-out for the Bal Harbour Village Water Main Replacement. The project consisted of the installation of a <br />12 -inch water main along the east side of Collins Avenue intended to augment the existing water main system to <br />boost existing pressures and flows to the village's high rise district. Construction included the installation of 1,800 <br />linear feet of 12 -inch directionally drilled water main, 680 LF of 12 -inch DIP water main, fire hydrant assemblies and <br />connection to nine (9) existing mains. <br />Project Cost: $558,590 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />117 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />a. <br />Craig A. Smith & Associates, <br />Boca Raton, Florida <br />Prime Consultant <br />Inc. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />C. <br />117 <br />