Laserfiche WebLink
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />2018 Watermain Improvements — Phase 11 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Margate, Florida Ongoing Ongoing <br />23. PROJECT OWNER'S INFORMATION <br />p. PROJECT OWNER q. POINT OF CONTACT POINT OF CONTACT TELEPHONE NUMBER <br />City of Margate Alberto Torres -Soto (954) 972-0828 <br />Senior Engineer <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, andcost) <br />Preliminary planning, survey, utility locates, soft digs, design, preparation of construction plans and contract <br />documents, and permitting for the Phase II Watermain Improvements project consisting of replacing 2 -inch <br />galvanized steel WM with 6 -inch DIP at 15 different locations throughout the City including a total replacement of <br />approximately 12,000 linear feet of water main infrastructure. Design also included water service replacements, <br />ACP removal, fire hydrant replacement, fire hydrant spacing analysis, road and landscape restoration, and a valve <br />shutdown plan. <br />Project Cost: $1,834,414 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />119 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />a. <br />Craig A. Smith & Associates, <br />Boca Raton, Florida <br />Prime Consultant <br />I nc. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />C. <br />119 <br />