Laserfiche WebLink
EXAMPLE PROJECT KEY <br />NUMBER <br />7 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Lake Osborne Estates Water Replacement Phase I PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Lake Worth, Florida Ongoing Ongoing <br />23. PROJECT OWNER'S INFORMATION <br />S. PROJECT OWNER t. POINT OF CONTACT U. POINT OF CONTACT TELEPHONE NUMBER <br />City of Lake Worth Giles M. Rhoads, P.E. (561) 586-1640 <br />Utilities Engineer <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Survey, utility location, preparation of engineering design plans, preliminary cost estimates, community outreach for <br />the installation of 16,400 LF of new water main serving 228 residences within the Lake Osborne Estates <br />neighborhood. Pipe sizes range from 4 -inch to 8 -inch with fire protection provided. Work also includes the <br />abandonment of existing water mains and the relocation of water meters and services from the rear of the <br />residential lots to the front of the lots. Design is approximately 60% completed to be followed by permitting, <br />contract documents, construction inspection and engineering services during construction. <br />Project Cost: $1,800,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />120 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />a. <br />Craig A. Smith & Associates, <br />Boca Raton, Florida <br />Prime Consultant <br />Inc. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />C. <br />120 <br />