Laserfiche WebLink
21. TITLE AND LOCATION (City and State) <br />Sanitary Sewer Improvements Phase I <br />Bal Harbour, Florida <br />PROFESSIONAL SERVICES <br />2016 <br />23. PROJECT OWNER'S INFORMATION <br />CONSTRUCTION (If applicable) <br />2017 <br />Y_ PROJECT OWNER Z. POINT OF CONTACT aa. POINT OF CONTACT TELEPHONE NUMBER <br />Bal Harbour Village John Oldenburg (305) 866-4633 <br />Director of Parks & Public Spaces <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Survey, utility locates, design, permitting, preparation of construction plans, cost estimates, contract documents, <br />assistance during bidding, construction management and certification through project close-out for the Wastewater <br />Pump Station No. 3 and Gravity Sewer Improvements (Sanitary Sewer Improvements Phase 1) project for Bal <br />Harbour Village. The project includes the installation of a new triplex submersible pump station with a 12 -foot <br />diameter wet well, control panel, automatic transfer switch receptacle, emergency generator, and all associated <br />appurtenances, in addition to approximately 1,350 linear feet of 18" gravity sewer lines to the pump station. <br />Project Cost: $2,970,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />122 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />a. <br />Craig A. Smith & Associates, <br />Boca Raton, Florida <br />Prime Consultant <br />Inc. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />C. <br />122 <br />