Laserfiche WebLink
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />SW 2nd Street Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Pompano Beach, Florida Ongoing Ongoing <br />23. PROJECT OWNER'S INFORMATION <br />bb. PROJECT OWNER Cc. POINT OF CONTACT dd. POINT OF CONTACT TELEPHONE NUMBER <br />City of Pompano Beach Tammy Good (954) 786-5520 <br />Engineering Project Manager <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Survey, utility locates, geotechnical engineering, engineering drainage analysis, preparation of preliminary engineering <br />design and construction plans, cost estimates, contract documents and assistance during bidding, shop drawing <br />review, construction observation and engineering services during construction, and certification through project <br />closeout for the SW 2nd Street Drainage Improvements project which is located between Dixie Highway and Cypress <br />Road and south of Atlantic Boulevard within the City's Government District. The project also includes a proposed <br />stormwater system on SW 1st Avenue and SW 1st Court. The 0.43 miles of roadway are to be designed to alleviate <br />existing flooding concerns with the possibility of an offsite discharge to a nearby canal. <br />Project Cost: $550,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />123 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />a. <br />Craig A. Smith & Associates, <br />Boca Raton, Florida <br />Prime Consultant <br />Inc. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />C. <br />123 <br />