My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />SW 2nd Street Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Pompano Beach, Florida Ongoing Ongoing <br />23. PROJECT OWNER'S INFORMATION <br />bb. PROJECT OWNER Cc. POINT OF CONTACT dd. POINT OF CONTACT TELEPHONE NUMBER <br />City of Pompano Beach Tammy Good (954) 786-5520 <br />Engineering Project Manager <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Survey, utility locates, geotechnical engineering, engineering drainage analysis, preparation of preliminary engineering <br />design and construction plans, cost estimates, contract documents and assistance during bidding, shop drawing <br />review, construction observation and engineering services during construction, and certification through project <br />closeout for the SW 2nd Street Drainage Improvements project which is located between Dixie Highway and Cypress <br />Road and south of Atlantic Boulevard within the City's Government District. The project also includes a proposed <br />stormwater system on SW 1st Avenue and SW 1st Court. The 0.43 miles of roadway are to be designed to alleviate <br />existing flooding concerns with the possibility of an offsite discharge to a nearby canal. <br />Project Cost: $550,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />123 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />a. <br />Craig A. Smith & Associates, <br />Boca Raton, Florida <br />Prime Consultant <br />Inc. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />C. <br />123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.