Laserfiche WebLink
12. NAME <br />David R. Jones, P.E. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com tete one Section E for each key erson <br />13. ROLE IN THIS CONTRACT <br />Mechanical Engineer <br />14. YEARS EXPERIENCE <br />TOTAL b. WITH CURRENT <br />29 1 4 <br />15. FIRM NAME AND LOCATION (CityandState) <br />Smith Engineering Consultants, Inc., 2161 Palm Beach Lakes Blvd., Suite 312, West Palm Beach, FL 33409 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science in Mechanical Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Florida/Mechanical Engineering <br />a. (3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.) AND SPECIFIC ROLE I [X] Check if project performed with current firm <br />Mechanical design for a new stormwater pump station. This pump station consisted of six (6) electric motor operated pumps with both upstream <br />and downstream water level monitoring. A backup diesel generator was designed to provide power for full pumping capacity. Reduced -voltage <br />motor starters were designed to reduce the starting inrush current for the large electric motors. Mechanical design included motor operated gates <br />for control structures, air conditioning of the main electrical room, and plumbing. <br />b. (3) BRIEF DESCRIPTION (Brietscope, size, cost etc.) AND SPECIFIC ROLE I [X] Check if project performed with current firm <br />Mechanical design for several new stormwater pump stations throughout the Village of Wellington. These pump stations consisted of electric <br />motor operated pumps with both upstream and downstream water level monitoring. A backup diesel generator was designed at each pump <br />station to provide power for full pumping capacity. Mechanical design included ventilation and plumbing throughout the pump stations. <br />C. (3) BRIEF DESCRIPTION (Brfefscope, size, cost, etc.) AND SPECIFIC ROLE I [X] Check if project performed with current firm <br />Mechanical design for a new stormwater pump station. This pump station consisted of three (3) electric motor operated pumps with both <br />upstream and downstream water level monitoring. Provisions for a future backup diesel generator were designed to provide power for full <br />pumping capacity. Mechanical design included motor operated gates for control structures, ventilation of the main electrical room, and <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE I [X] Check if project performed with current firm <br />Mechanical design for two (2) redundant air-conditioning systems to cool the electrical equipment room. These split(DX) systems were of a <br />low profile, space saving design so as to maximize the available space for the electrical equipment. Air conditioning of the variable frequency <br />drives (VFD's) serves to extend the life of these expensive devices. <br />e. (3) BRIEF DESCRIPTION (eriefscope, size, cost, etc.) AND SPECIFIC ROLE I [X] Check if project performed with current firm <br />Mechanical design for the two (2) redundant air-conditioning systems to cool the electrical equipment room of the reclaimed water pump <br />station. These split(DX) systems were of a low profile, space saving design so as to maximize the available space for the electrical equipment. <br />Air conditioning of the variable frequency drives (VFD's) serves to extend the life of these expensive devices. <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />133 <br />