Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />2U. LXAMF'LL PKUJL(:I KLY <br />NUMBER <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />City of West Palm Beach Suzanne Halverson, P.E. (561) 494-1075 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />This award winning project included the replacement of a wastewater force main pipeline, and the rehabilitation of two <br />(2) existing pump stations. Pump Station No. 3's submersible pumps were replaced to meet the new flow and head <br />requirements. Control panel upgrades were designed to accommodate the parameters of the new submersible pump <br />motors. <br />At Pump Station No. 5, a new electrical service (including a City -owned step-up transformer) was designed to handle the <br />additional electrical load of the station. A replacement of the three (3) existing VFD's was accomplished within the <br />existing motor control center. Provisions to connect a portable generator through a manual transfer switch were also <br />provided. <br />Total Project Cost = $1,300,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (6/2004) PAGE 3.1 <br />134 <br />