My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�- F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br />SEC <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. 2 <br />Complete one Section F for each aroect. <br />• •COMPLETED <br />Palm Beach County LS 5243 Generator Installation PROFESSIONAL SERVICES CONSTRUCTION (if Applicable) <br />Delray Beach. Florida 2007 2008 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Palm Beach County John Rich, P.E. 1 (561)493-6116 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The design is presently being completed for the installation of a standby power generator and diesel fuel tank at the <br />County's existing Lift Station No. 5243. The existing chemical building is being modified to house the relocated <br />generator. A new above ground, diesel fuel tank will be installed on site to provide adequate fuel for the required duration <br />of operation. <br />A new electrical service was designed, including a new automatic transfer switch, to provide both normal and emergency <br />power to the wastewater pumps. A new pump control panel was designed in accordance with the County's latest <br />standards. <br />Total Project Cost = $100,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (6/2004) PAGE 3.2 <br />135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.