My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />SEC <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each protect.) <br />23. PROJECT OWNER'S INFORMATION <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />4 <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Lake Worth Mike Thew, P.E. (561) 586-1671 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Two (2) existing wastewater pump stations were recently rehabilitated. The work included the installation of new <br />variable frequency drives (VFD's) and remote telemetry units (RTU's) for the control of existing wastewater pumps. At <br />the Master -Pump Station a new electrical room was enclosed and air-conditioned to house the new VFD's. The existing <br />electrical service was modified to distribute power to the new equiopment. <br />At the Repump Station new VFD's were installed within the pump station and fed from the existing electrical service <br />which was modified for this purpose. Upgraded telemetry systems were designed for both stations to replace the existing, <br />aging systems, and to provide control and status reporting to the existing central station. <br />Total Project Cost = $500,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />I Im <br />STANDARD FORM 330 (612004) PAGE 3.4 <br />137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.