My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />11 <br />i (Present as many projects as requested by the agency, or 90 projects, If not specified. <br />23. PROJECT OWNER'S INFORMATION <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />5 <br />a. PROJECT OWNER b.• POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Lake Worth Mike Thew, P.E. (561) 586-1671 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Two (2) new standby power generators and remote telemetry units (RTU's) were designed, one (1) at each of the two (2) <br />existing north and south water booster stations in the City of Lake Worth. Each generator consists of a self-contained <br />skid -mounted, diesel fuel tank below the generator enclosed with a weatherproof, sound -attenuating enclosure. <br />A new electrical service was designed at each pump station, including a new automatic transfer switch, to provide both <br />normal and emergency power to the existing water booster pumps. Motorola MOSCAD telemetry systems were specified <br />to provide control and status reporting to the existing central station. <br />Total Project Cost = $250,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (6/2004) PAGE 3.5 <br />138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.