Laserfiche WebLink
Proposal Title: =. Ardaman & Associates, Inc. <br />12. NAME 113. ROLE IN THIS CONTRACT <br />Roberto E. Balbis, P.E. I Principal Geotechnical Engineer <br />15. FIRM NAME AND LOCATION (City and State) <br />Ardaman & Associates, Inc. — West Palm Beach, Florida <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />46 1 44 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE) <br />B.S., Civil Engineering, University of Florida Professional Engineer, Florida No. 15832 <br />M.S., Civil Engineering, University of Florida Special Inspector Threshold Bldgs.) Florida Ctf. No. 0013 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Cuban -American Association of Civil Engineers Association of Soil and Foundation Engineers <br />American Society of Civil Engineers Florida Institute of Consulting Engineers <br />National Society of Professional Engineers <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 3/2013) <br />171 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Port of Palm Beach — Environmental and Geotechnical Services <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />Riviera Beach, Florida <br />2016 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />a' <br />Mr. Balbis has provided Geotechnical Engineering services to the Port of Palm Beach since the 1980's. He was the foundation <br />engineer for the Cruise Terminal presenting recommendations for the support of that building on shallow foundations, which <br />resulted in significant savings to the Port. He was also involved in remediation work for the sinkhole condition that developed in <br />Pier #3 in the 1980's, the extension of Pier #2 in the 1990's, the foundations for molasses tanks, and other projects. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />South Florida Water Management District PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />Gun Club Road, West Palm Beach 2015 <br />b' <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Mr. Balbis has served as Principal Engineerfor various continuing contracts since 1985 with the South Florida Water Management <br />District including for testing of construction materials, design and inspection of dams, and for geotechnical engineering services. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Geotechnical Engineering, Materials Testing and Inspection Services PROFESSIONAL SERVICES <br />I CONSTRUCTION (ifapplicable). <br />Palm Beach County, Florida 2011-2014 <br />(3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />c. <br />Mr. Balbis has been the contract manager/senior project engineer for this continuing contract for several years. He routinely <br />coordinates geotechnical and environmental investigations on County that include Acreage Branch Library, Government Center <br />Chiller Replacement, Historic Courthouse Renovation, Palm Beach County Courthouse, South County Courthouse Parking <br />Garage, Jupiter Library Expansion, and various roadway improvements projects that include paving, pipeline installation and <br />drainage improvements. Approximate annual fees: $50,000. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Palm Beach County Health Department— New Administration Bldg. PROFESSIONAL SERVICES, <br />I CONSTRUCTION (ifapplicable) <br />Geotechnical Engineering, West Palm Beach, Florida 2008 <br />d' <br />3 BRIEF DESCRIPTION (Briefsco a size, cost etc. AND SPECIFIC ROLE <br />() p , ) ®Check if project performed with current firm <br />Mr. Balbis as the senior project manager on this project which consisted of the subsurface exploration and prepared site <br />preparation and foundation design recommendations for this project. Fees $22,000. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />CityPlace Shopping / Municipal Complex— Geotechnical Engineering, PROFESSIONAL SERVICES <br />CONSTRUCTION (if applicable) <br />Materials Testing and Threshold Inspection Services 1996— 2000 <br />West Palm Beach, Florida <br />e, <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Ardaman provided environmental, geotechnical, materials testing services for this large shopping complex in downtown WPB. <br />Services included environmental assessments, geotechnical explorations and foundation design. This complex housed <br />commercial and residential property, as well as the Palm Beach County Convention Center. Mr. Balbis was senior project <br />manager and managed a team of threshold inspectors. Fees: $250,000. <br />STANDARD FORM 330 (REV. 3/2013) <br />171 <br />