My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Miami Beach barking Department <br />a City of Miami Beach Parks Department <br />City of Miami Beach Planning Department <br />City of Miami: Beach Public works Department <br />Miami )ade County Department of Regulatory and Economic Resources (RER) <br />n Mlaml-Dade County Water and Sewer Department <br />Miami -Dade County Public Works Department <br />is Miami -Dade Department of Health and Rehabilitative Services <br />South Florida Water Management Department <br />a Florida Department of Environmental Protection <br />U.S. Army Corps of Engineers <br />V U.S. Environmental Protection Agency <br />Notwithstanding the above, the CITY's failure to identify governmental authorities that have jurisdiction <br />over project shall not relieve DESIGN -BUILDER from its sole responsibility to procure all requisite <br />permits. <br />Deiiveratstes: - Correspond with noted jurisdictional authorities to establish permitting <br />requirements. <br />- Revise documents and respond to permitting Inquiries as required. <br />- Attend meetings with the Ct i Y, and/or permitting agency staff as required to <br />review, discus and linaiize permit procurement. <br />Schedule: - Complete concurrently with Design Phase schedule. <br />1185k ZX —The D 5JGN-8Ull1)9K,L Qf;= Of E3921e0 Doeumentr DESIGN -BUILDER shalt establish and <br />maintain an in -louse Quality Assurance / Quality Control (QAI EC) program designed to verify and <br />ensure the quality, clarity, completeness, and constructablilty of its design documents. The CITY, at its <br />dlscretlon, may require the DESIGN -BUILDER attend public meetings or meetings with Qty Staff to <br />review the status and present results of Its QAIM efforts. Items to be addressed may include, but shall <br />not be limited to, review of specifications by respective technical experts and review of the documents <br />to ldentWy conflicts and Inconsistencies between the various project disciplines. <br />Task 2.9 —DESIGN-i3UlLDER-Chrersleh As required in Section 5 of the Agreement, the DESIGN -BUILDER <br />shall supervise the design services undertaken by any and all of its design consultants and oversee and <br />superv;se the value engineerin& the Community Meetings and the production of the varying stages of <br />the cost proposals. <br />Task 3—As-Bid Contract Docurneirts <br />The purpose of this Task is to establish requirements for the preparation of as-btd contract documents <br />for the ProjeLt. Task deliverables shall comply with minimum requirements of the PWD Manual (latest <br />edition). <br />�asrs a.i—conrorrrc acrd corrtsact D6cun�+nrsr Upon completion of construetabiilty reviews, value <br />engineering discussions, and revisions made during the negotiation of the GMP, the DESIGN -BUILDER <br />shall Incorporate revisions to the drawings as appropriate and as approved by the City to farm the As - <br />10 <br />212 <br />230 <br />
The URL can be used to link to this page
Your browser does not support the video tag.