My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule: -Weekly throughout the Project duration. <br />TTa5k Jā I?rocessTnrr of Shorn QrawlM: The DESIGN -BUILDER will provide shop drawings to the CITY <br />for their review. The CITY shall have fourteen (14) calendar days from the time of receipt in Its office, to <br />review and return shop drawings to the DESIGN -BUILDER. The DESIGN -BUILDER will address each of the <br />CIIY's comments, in writing. <br />Dellverablew -Provide three (3) wples of shop drawings to the CITY. <br />-Provide written responses to the CITY of all shop drawings review comments <br />Schedule: - -ongoing through Project duration. <br />Task 4.4ā Construction Inspections: The DESIGN -BUILDER shall provide construction Inspections (not - <br />to -exceed 36 -hours per week) through Project completion and final certification, to provide an adequate <br />quality of observation as required to reasonably verify that critical elements of the Project are being <br />complied with, and that the general intent of the contract documents is being met. <br />The DESIGN-BUILDEWs field staff shall be on-site part-time as warranted. The construction Inspections <br />shall monitor all Contractor work crews. <br />In general, the DESIGN -BUILDER shall observe the construction of the Work and-- <br />a) <br />nd_ <br />a) Conduct on-site nb+servafions of the Work in progress to assist in determining If the provisions of <br />the contract documents and permit conditions are being fulfilled. DESIGN -BUILDER shall report, <br />to the CITY, in writing, whenever It is believed that Work does not conform to the contract <br />documents, does not meet the requirements of Inspections, test, or has been damaged prior to <br />final payment. <br />b) Maintain a daily log of Work performed. The daily notes shall include records of when the <br />DESIGN -BUILDER is on the jab -site, weather conditions, change orders, or changed conditions, <br />list of job site visitors, daily drilling and testing activities, observations in general, and specific <br />observations in mon: detall as in the case of observing test procedures. Record, In wrtting, the <br />outcome ofthese inspections. DESIGN -BUILDER shall Identify any utilities damaged and verily <br />that the Contractor has notified the respective utlilty owner. <br />c) Verify that tests, equipment and systems4tart-up are conducted In the presence of appropriate <br />personnel and maintain adequate records thereof, and observe, record, and report appropriate <br />details relative to the test procedures and start-up. <br />d) Provide a photographic record of the construction, beginning with pre -construction <br />documentation and completing with post -construction photographs. Photographs shall be <br />digital snapshot type taken to define the progress of the Project and shall be labeled as to date, <br />location, view, electronically filed by month, and signed by the DESIGN -BUILDER. <br />12 <br />a to <br />231 <br />
The URL can be used to link to this page
Your browser does not support the video tag.