My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
° Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering • 3D Subsurface Imaging • Utility Coordination <br />BAL HARBOUR VILLAGE <br />SAN ITARY SEWER I M PROVEM ENTS PHASE I <br />Responsibilities: <br />Project Description: <br />The Wastewater Pump Station No. 3 and Gravity Sewer <br />Improvements (Sanitary Sewer Improvements Phase 1) <br />project for Bal Harbour Village includes the installation of a <br />new triplex submersible pump station with a 12 -foot <br />diameter wet well, control panel, automatic transfer switch <br />receptacle, emergency generator, and all associated <br />appurtenances, in addition to approximately 1,350 linear <br />feet of 18" gravity sewer lines to the pump station. The <br />project design cost was $182,804. Construction began in <br />January 2016 and substantial completion was reached in <br />April 2017 with an estimated construction cost of <br />$2,970,000. <br />Survey, utility locates, design, permitting, preparation of construction plans, cost estimates, <br />contract documents, assistance during bidding, construction management and certification <br />through project close-out. <br />Key Personnel: <br />Stephen C. Smith, P.E. - Senior Vice President; Robert D. Keener, P.S.M. - Vice President - <br />Survey; James Driscoll - Utility Locates Director; Greg A. Gi.arratana - Senior Supervising <br />Engineer; Al Caruso, E.I. - Project Manager; Tony Gomes - Senior Field Representative <br />245 <br />7777 Glades Road, Suite 410, Boca Raton, FL 33434 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.